1 Modification of Clause 6 Para (a), Part I of Indian Railways Standard Conditions of Contract, July 2014 The revised para (a) of Clause 6 is modified
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
PGT DIV/SOUTHERN RLY TENDER DOCUMENT
www.ireps.gov.inDMM acting for and on behalf of The President of India invites E-Tenders against Tender No 91187529 Closing Date/Time 25/01/2019 10:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only.
PRINCIPAL CHIEF MATERIALS MANAGER acting for and on …
www.ireps.gov.in6 Additional Tender Condition for inclusion in Tender Schedule for GST compliance. [a] All the bidders/tenderers should ensure that they are GST
DRAFT INSTRUCTIONS TO TENDERERS FOR E-TENDERING …
www.ireps.gov.in1 DRAFT INSTRUCTIONS TO TENDERERS FOR E-TENDERING AS PROVIDED BY RAILWAY BOARD (Railways may suitably modify these instructions as per their requirement and upload the
1. NIT HEADER MORADABAD DIVISION …
www.ireps.gov.in7 Item Description:- Supply, installation, testing & commissioning of complete 18-20 watt LED Tube light fitting 1200mm Integrated with Aluminium extrusion Base with LED & Driver, decorative pin type and end caps & copper
1. NIT HEADER TENDER DOCUMENT - ireps.gov.in
www.ireps.gov.inDY.CHIEF PLANT ENGINEER-II acting for and on behalf of The President of India invites E-Tenders against Tender No RCF-EL-MTC-28-ET-18-19 Closing Date/Time 11/02/2019 15:30 Hrs.
1. NIT HEADER BANGALORE DIVISION-ENGG/SOUTH …
www.ireps.gov.in2 013120Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, rain bunds if provided, platforms etc. with earth excavated from
1. NIT HEADER TENDER DOCUMENT
www.ireps.gov.inDescription:- Providing post-tensioned prestressed cement concrete Girders/slabs etc. in design mix with 20 mm graded machine crushed stone aggregate with steel form work over scaffolding, staging, centring etc. including providing and fixing sheathing as profile as 2 NS2 90.00 Metre 4917.30 442557.00 AT Par 442557.00
1. NIT HEADER TENDER DOCUMENT
www.ireps.gov.inAdvertised Value 1919970.24 Tendering Section SDAH ROB Bidding Style Single Rate for Each ScheduleBidding Unit Earnest Money (Rs.) 38400.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 0.00 Period of Completion 6 Months Contract Type Works Contract Category Expenditure Bidding Start Date 19/01/2022 Are Joint Venture (JV) firms allowed to ...
1. NIT HEADER ASANSOL DIVISION-S AND T/EASTERN RLY …
www.ireps.gov.inLED color Red as per RDSO Spec No. SPN/TC / 62 /2008 Rev. 3.0 Amdt. -2 or latest (All fixing materials including GPS clock to be supplied by contractor). Inspection: Consignee 2 A 29.00 Numbers 20224.75 586517.75 AT Par 586517.75 Rs. Description:- Supply of Short Haul SFP (SMALL FORM FACTOR PLUGGABLE) transreceiver. Power range(-15dBm to -08dBm).
1. NIT HEADER BANGALORE DIVISION-ENGG/SOUTH …
www.ireps.gov.inwith polymer coated 'J' or 'L' hooks, bolts and nuts 8mm dia. G.I. plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% Ultra-violet stabilizer in resin system under approximately 2400 psi and hot cured. They shall be of
Related documents
Standard General Conditions Of Contract - Indian Railway
www.indianrailways.gov.inIndian Railways Standard General Conditions Of Contract As On 30 th June 2014 Page 2 PART - II STANDARD GENERAL CONDITIONS OF CONTRACT Para Subject Page 1. Definitions And Interpretation 23 (1) Definitions 23
General, Standards, Conditions, Contract, Standard general conditions of contract
A Basic Guide to the General Conditions of Contract for ...
cidb.org.za1 1 An overview of GCC 2004 1.1 Structure and content The General Conditions of Contract for Construction Works, which is commonly referred to as
Guide, General, Conditions, Contract, Construction, Guide to the general conditions, General conditions of contract for construction
THE NATIONAL TREASURY Republic of South Africa
www.treasury.gov.za4 General Conditions of Contract 1. Definitions 1. The following terms shall be interpreted as indicated: 1.1 “Closing time” means the date and hour specified in the bidding
General, Conditions, Republic, National, South, Treasury, The national treasury republic of south, General conditions
General Conditions of Contract PracNote9 of 2007-08 19-2 …
www.treasury.gov.za3 General Conditions of Contract 1. Definitions 1. The following terms shall be interpreted as indicated: 1.1 “Closing time” means the date and hour specified in the bidding
General, Conditions, Contract, General conditions of contract
A GUIDE TO CONSTRUCTION CONTRACTS - Bowmans Law
www.bowmanslaw.comA Guide to Construction Contracts 5 What is a contract? Construction contracts A contract is an agreement entered into between two or more people with the
www.indianrailways.gov.in
www.indianrailways.gov.inCopy to 2 3. 4 5. 6. 8. 9. 10. 11 12 The Director, Indian Railway Institute of Civil Engineering, Pune. The Director, Indian Railway Institute of Mechanical and ...
The GCC 2015 (3 Edition) Welcomed with Open Arms
www.mdalaw.co.zaPage 3 Fifth Edition – May 2016 Clause 1.3.6: “Except where otherwise stated in the Contract, the Employer shall retain the copyright and other intellectual property rights in documents supplied to the Contractor under the Contract.
Open, With, Edition, Arms, Welcomed, Welcomed with open arms