Attachment C Design Deliverable Schedule, 30-60-90-100%
Section 01 3300 submittal schedule) X When IBC/IEBC, Design Professional in Responsible Charge designation form (ESM Chapter 16, IBC-GEN, Form 3) final X When IBC/IEBC, (1) Test and Inspection Requirements (TIP or VIT) and (2) Statement of Special Inspections (ref LANL ESM Chapter 16, IBC-IP Att. B and I) Preliminary X Final X
Tags:
Requirements, Schedule, Submittal, Deliverable, Submittal schedule, Deliverable schedule, 30 60 90
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
1.0 ACCEPTANCE CRITERIA FOR COMPLETED WELDS
engstandards.lanl.govLANLEngineering Standards Manual ISD 341-2 Chapter 13, Welding & Joining Section WFP 2-01 – Welding Fabrication Procedure Rev. 1, 10/27/06 Attachment 2, ASME B31.3, “Process Piping” Acceptance Criteria
Criteria, Completed, Acceptance, Weld, Acceptance criteria for completed welds
MINIMUM FILLET WELD SIZE
engstandards.lanl.govLANL Engineering Standards Manual ISD 341-2 Chapter 13, Welding & Joining Section WFP 2-04 – Welding Fabrication Procedure Rev. 1, 10/27/06 Attachment 2, Minimum Fillet Weld Size for Prequalified Joints
1.0 JOINT FIT-UP AND ALIGNMENT
engstandards.lanl.govLANLEngineering Standards Manual ISD 341-2 Chapter 13, Welding & Joining Section WFP 2-01 – Welding Fabrication Procedure Rev. 1, 10/27/06 Attachment 3, ASME B31.8, Gas Transmission & Distribution Piping Alignment and Acceptance Criteria
LANL Engineering Standards Manual ISD 341-2 Chapter 13 ...
engstandards.lanl.govThe size of a fillet weld is determined as shown in Figure 2 of this Attachment. Typical minimum fillet weld details for slip-on flanges and socket-welding components are also contained in Figure 2 of this Attachment. Undercuts shall not exceed 1/ 32 in. and
Size, Minimum, Weld, Fillet weld, Fillet, Minimum fillet weld
HANGERS AND SUPPORTS FOR - LANL Engineering …
engstandards.lanl.gov2.1 pipe hangers and supports A. Hangers for Pipe Sizes 1/2 to 1-1/2 inches: Carbon steel, adjustable, clevis, or malleable iron or carbon steel, adjustable swivel, split ring.
Support, Pipe, Hanger, Hangers and supports for, Pipe hangers and supports
1.0 ACCEPTANCE CRITERIA FOR COMPLETED WELDS
engstandards.lanl.gov1.2 Socket and Fillet Welds 1.2.1 As-welded surfaces are permitted; however, the surface of welds shall be sufficiently free from coarse ripples, grooves, overlaps, abrupt ridges, undercut, and valleys. 1.2.2 The surface condition of the finished welds shall be suitable for the proper interpretation of nondestructive examinations.
1.0 ACCEPTANCE CRITERIA FOR COMPLETED WELDS
engstandards.lanl.gov1.2 Seal, Socket, and Fillet Welds 1.2.1 As-welded surfaces are permitted; however, the surface of welds shall be sufficiently free overlaps, abrupt ridges, and valleys. 1.2.2 Limitation on imperfections in socket, fillet and seal welds are the same as in Paragraph 1.1.4 and 1.19 for cracks, lack of fusion, and undercut.
HANGERS AND SUPPORTS FOR - Los Alamos National …
engstandards.lanl.govA. Hangers for Pipe Sizes 1/2 to 1-1/2 inches: Carbon steel, adjustable, clevis, or malleable iron ... I. Provide insulation continuous through hangers and rollers. Protect insulation by steel shields in accordance with Section 15250, Mechanical Insulation. J. Provide hangers on piping on each side of, and within 6 inches of, hubless pipe ...
1.0 JOINT FIT-UP AND ALIGNMENT - Los Alamos National ...
engstandards.lanl.gov2.1.6 When the pipe size is less NPS 6 or the project involves a limited number of welds that NDE examination would be impractical, and the system is intended to operate at 40% or less of specified yield strength, then provisions of paragraphs 2.12, 2.13, and 2.1.5 are not mandatory, provided the welding is examined visually by a
Related documents
QUALITY ASSURANCE and QUALITY CONTROL PLAN
lib.store.yahoo.netrequirements and that all personnel performing work are properly qualified and certified ... o Submittal Schedule and Log of any remaining Closeout Data such as Operations and Maintenance manuals, As Built Drawings, Warranties, etc. o Listing and locations of operations and maintenance tools and spare
QUALITY ASSURANCE and QUALITY CONTROL PLAN
lib.store.yahoo.netrequirements and that all personnel performing work are properly qualified and certified ... o Submittal Schedule and Log of any remaining Closeout Data such as Operations and Maintenance manuals, As Built Drawings, Warranties, etc. o Listing and locations of operations and maintenance tools and spare
Quality, Control, Requirements, Schedule, Assurance, Plan, Submittal, Submittal schedule, Quality assurance and quality control plan
1200C Permit after management review and resposne - Oregon
www.oregon.govand DEQ 401 water quality certification requirements before applying ... SCHEDULE A CONTROLS AND EFFLUENT LIMITATIONS ..... 6 1. CONSTRUCTION GENERAL PERMIT ... 1.2.1 Application submittal -----6 1.2.2 Items that must be included in the application ...
Plans Submittal Requirements
www.mecknc.govaround in 5-7 business days. You will find CTAC Electronic Plan Submittal & Review requirements here . Please see the Commercial Technical Assistance Center (CTAC) section below for additional review. The CTAC area answers general code questions by phone 704-336-3829 x 4 or in person, at our offices, 700 N Tryon Street 1 st Floor.
Fire Sprinkler Pipe - Wheatland
www.wheatland.comSUBMITTAL INFORMATION FM Approved and Fully Listed Sprinkler Pipe Wheatland Tube’s Schedule 40 steel fire sprinkler pipe is FM Approved and UL® and C-UL Listed. Approvals and Specifications Schedule 40 meets or exceeds the following standards: • ASTM A795, Type E, Grade A (Schedule 40, 1–2 NPS) • ASTM A53, Type E, Grade B
COUNTY OF LOS ANGELES - Los Angeles County Department …
publichealth.lacounty.govINFORMATION REQUIRED FOR PLAN SUBMITTAL The proper layout and construction of a food facility is an important element in a successful and profitable business. It assures that you will meet all structural and operational requirements of the applicable health laws and, at the same time, meet the objective of serving safe and wholesome food
SUBMITTAL FOR CHARLOTTE PIPE PVC SCHEDULE 80 …
www.charlottepipe.comASTM D 1785: PVC Plastic Pipe, Schedule 80 ASTM D 2464 or D 2467: PVC Threaded Fittings, Schedule 80 ASTM D 2467: PVC Socket Fittings, Schedule 80 ASTM D 2564: Solvent Cements for PVC Pipe and Fittings SUBMITTAL FOR CHARLOTTE PIPE ® PVC SCHEDULE 80 PRESSURE PIPE AND FITTING SYSTEM
PROJECT ENGINEER JOB DESCRIPTION
www.canr.msu.eduProject Schedule • Distributes overall project schedule monthly (min.) • Will take necessary actions to maintain or improve project schedule • Keeps current on weekly job site work activities Teamwork • Shows respect for duties of other team members. • Supports and interacts with project PC to perform as a cohesive team.
RMS User’s Guide - United States Army
rms.usace.army.milJan 23, 2012 · Resident Management System RMS User’s Guide Software Version 2.38 23 January 2012 Folsom Bridge Project Sacramento District - CESPK Resident Management System