1 SJECCD Joint-Use 21st Century Post-Secondary Education Center RFP #0606-14 Attachment 14: BIM Standards Page 1 of 8 ATTACHMENT 14 BIM Standards BIM Standards San Jos Evergreen Community College District Joint-Use 21st Century Post-Secondary Education Center Contents Project BIM Approach Narrative------------------------------- ---------------------------------- 2 Staffing Expectations ---------------------------------------- --------------------------------------- 2 Model Performance Expectations ---------------------------------------- ---------------------- 2
2 Colocation ---------------------------------------- ---------------------------------------- -------------- 2 Expected BIM Uses (checklist to vary by project) ---------------------------------------- --- 3 Software Standards ---------------------------------------- ---------------------------------------- - 3 Model Authoring Platforms ---------------------------------------- ---------------------------------------- -------------------- 3 Model Aggregation & Coordination Platform ---------------------------------------- ------------------------------------- 3 General Model Requirements ---------------------------------------- ---------------------- 4 File Transfer Solution &
3 Required Upload/Archive Schedule ------------------------- 4 File Transfer Solution ---------------------------------------- ---------------------------------------- ---------------------------- 4 Regular Upload Schedule ---------------------------------------- ---------------------------------------- ----------------------- 4 Milestone Uploads ---------------------------------------- ---------------------------------------- -------------------------------- 4 Review During BEP Session(s) ---------------------------------------- ---------------------------------------- ----------------- 4 Required Model Level of Detail ---------------------------------------- --------------------- 5 Geometry Requirements ---------------------------------------- ---------------------------------------- ----------------------- 5 Structure: ---------------------------------------- ---------------------------------------- ---------------------------------------- 5 Architecture.
4 ---------------------------------------- ---------------------------------------- ------------------------------------ 5 Mechanical: ---------------------------------------- ---------------------------------------- -------------------------------------- 6 Plumbing: ---------------------------------------- ---------------------------------------- ---------------------------------------- 6 Fire Sprinkler: ---------------------------------------- ---------------------------------------- ----------------------------------- 6 Civil.
5 ---------------------------------------- ---------------------------------------- ---------------------------------------- -------- 7 Estimating & Quantity Takeoff ---------------------------------------- ---------------------- 8 Turnover Expectations [if any] ---------------------------------------- ---------------------- 8 San Jos Evergreen Community College District #309 Joint-Use 21st Century Post-Secondary Education Center Version 1 | SJECCD Joint-Use 21st Century Post-Secondary Education Center RFP #0606-14 Attachment 14.
6 BIM Standards Page 2 of 8 Project BIM Approach Narrative The expectation of the San Jos Evergreen Community College District is that BIM will be the vehicle for advanced project communication, but will not reassign, modify or otherwise change any existing responsibilities that exist in the current project. The expectation is that modeling effort on the Joint-Use 21st Century Post-Secondary Education Center will maximize the project budget, while eliminating future costs related to construction, and operations.
7 The following guide is prescriptive in nature, to reinforce the direct correlation between the quality of the design model and overall project success. Upon award of the project and prior to any model authoring, the owner and design team will conduct BIM Execution Planning (BEP) session(s) to review this document, establish working protocols, and populate the project-specific model progression specification. The owner wishes to work collaboratively with the construction team throughout the design and construction process, however, the owner reserves the right to reject any model submission due to non-compliance with this document or the BEP.
8 Staffing Expectations Throughout the project, the Design/Build team (DB) and each trade contractor should designate a team member (usually in the detailing department) to function as their respective model lead. The DB s model lead will provide overall model leadership for the construction team. Each model leader is responsible for ensuring the models adhere to the San Jos Evergreen Community College District model Standards and functioning as the point of contact for model related issues within the team.
9 The DB will use the trade contractor BIM Requirement in the procurement process to ensure a uniform BIM deliverable. The DB will be responsible for coordinating the models, meetings, and activities necessary to deliver a coordinated model. Model Performance Expectations San Jos Evergreen Community College District will not review any change orders or additional costs related to modeled systems that are incorrectly installed or modeled. This also includes models that fail to include their required scope.
10 The construction manager is responsible for those costs incurred remediating, correcting, or otherwise addressing those issues. Colocation At San Jos Evergreen Community College District s direction, this project may utilize a colocation or big room approach. This approach will be documented in the colocation work plan. It is expected that the DB will provide adequate staffing (BIM and project management staff) to meet the schedule and deliverables required in the colocation work plan.