Chapter 6. Tender and Contract Documents
6.2.2. Procurement Method According to the guideline s of JBIC this sub-project should adopt Local Competitive Bidding (LCB), since the construction cost is estimatedat less than 900,000,000 Japanese Yen (approximately 6 million JD) and not less than 400,000,000 Japanese Yen (approximately 2.7 million JD) .
Tags:
Guidelines, Chapter, Procurement, Japanese, Guideline s
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
CHAPTER 14 PROPOSED ROAD OPERATION AND …
openjicareport.jica.go.jpJuly 2002. Based on the final report, the inventory of road is as shown in Table 14-2-1. Table 14-2-1 Road Length under MPWT Length (Km) Type of Road Kandal National N1 Primary National Roads 165.3 2,002 N2 Secondary National Roads 111.2 2,754 N3-1 Provincial Roads 237.8 5,700 N3-2 Urban Roads under MPWT 0 1,700 Total 514.3 12,156
CHAPTER 5 Monorail System and Structures 5.1 Outline of ...
openjicareport.jica.go.jpRunning wheels are installed under the car body and those wheels are running on the top of the concrete beam. Guide wheels are installed at the lower portion of the car to hold the beam ... Trains will be operated with an Automatic Train Operation (ATO) system, however, manual ... Braking System
System, Automatic, Monorail, Braking, Braking system, Monorail system
CHAPTER 6 POWER PLANT OPERATION AND …
openjicareport.jica.go.jpas the management index. ROA is a composite index of the ratio of net profit on sales and the ratio of asset turnover and is a good appraisement at profitability and efficient use of asset. Fig. 6.1-1 “The management points of power plant” shows how each management point proposed in this chapter contribute to improve ROA.
CHAPTER 3 WATER SUPPLY SYSTEM - JICA
openjicareport.jica.go.jp(Clarifier) Detention Time 2 - 2.5 hours - Length of tank (rectangular) 30 - 100 m - Ratio of length to width 3:1 - 5:1 3:1 - 5:1 Length of square tank up to 20 m - Diameter of tank up to 60 m - Depth of tank 2.5 - 5 m 3 - 4 (Water m Inlet velocity 0.2 - 0.3 m/s less than 0.4 m/s Weir Loading up to 300 m3 /d/500 m3
CHAPTER 7 PROJECT COST ESTIMATE - JICA
openjicareport.jica.go.jp7-3 TABLE 7.2-1 COMPARISON OF UNIT PRICE (2/2) 408 Structural Steel kg 183.23 412(1)b Elastomeric Bearing Pad ( 606 x 306 x 60mm) pcs 6,698.166,985.16 SPL 414(c) Steel Girder Shoe Type F each 110,377.79 SPL 414(d) Ruber Filler (400 x 150 x 50mm) each 865.83 SPL 414(e) Hard Rubber Filler & Restrainer Bolts Dia 30mm sets 1,573.81 SPL 416(1)a Pile …
CHAPTER 4 TECHNICAL FEASIBILITY STUDY
openjicareport.jica.go.jpAs in the case of Male’ Island, the latest demand projection (Figure 4.1.2-1) is the one that was implemented in 2004, however, because values from 2004 onwards are not reflected in this forecast, the Study Team conducted a separate demand projection involving analysis of peak power from 2004 to 2008.
THE STUDY ON FLOOD CONTROL PROJECT …
openjicareport.jica.go.jpcontrol project implementation system. 1.2 Study Objectives The objectives of the Study are (1) To collect and review data and information of flood control projects and their relevant activities in the Philippines (2) To prepare and propose the improvement plan of …
THE STUDY ON FLOOD CONTROL PROJECT …
openjicareport.jica.go.jpCARP :Comprehensive Agrarian Reform Program CBFM :Community-Based Forest Management CBM :Community-Based Management CBFMO :Community-Based Forest Management Office CBFMS :Community-Based Forest Management Strategy CBRMP :Community Based Resource Management Project CBO :Community-Based Organization CDA …
Programs, Control, Strategy, Comprehensive, Reform, Floods, Carps, Flood control, Agrarian, Comprehensive agrarian reform program
BANGLADESH WATER DEVELOPMENT BOARD THE PEOPLE’S …
openjicareport.jica.go.jpbangladesh water development board . the people’s republic of bangladesh . the project for . capacity development of management for sustainable water related infrastructure . in . the people’s republic of bangladesh . final report . project completion report . september 2017 . japan international cooperation agency (jica) idea consultants, inc.
Report, Project, Bangladesh, Completion, Project completion report
BASIC EDUCATION SECTOR ANALYSIS REPORT - ETHIOPIA
openjicareport.jica.go.jp2010/11 to 2014/15, the government aims to achieve MDGs by 2015 and to become a middle-income country by 2020-2023. The ESDP-IV (2010/11-2014/15) is the development programme to realize the GTP and focus on the quality of education, especially implementing the General Education Quality Improvement Programme (GEQIP) components started in 2008.
Related documents
ONSTRUTION MANAGEMENT GUIDELINE FOR ROAD & …
openjicareport.jica.go.jp2.2 Existing Guidelines and Regulations 2.2.1 Existing Procurement and Implementation Guidelines (1) Bridge Law 2017 Bridge Law was drafted in 2016 and currently under process of approval. The Law has consisted of following 9 chapters. Role and responsibility of MOC and DOB have been stipulated in chapter 3 & 4 of the Law. These could be