Example: dental hygienist

Concrete Surcharge Summary

Record No. 5 QFC111 Concrete Surcharge Summary , 2014 Excel Concrete Pty Ltd Brisbane, Gold Coast, Sunshine Coast Prices DO NOT include 10% Effective 1st April 2014 ITEM CONDITION CHARGE Waiting Time Waiting Time applies after 30minutes on site. No Waiting Time is payable for the first 30 minutes of any delivery. $ per minute For a truck detained on site beyond 30 minutes outside Normal Hours of Operation $ per minute Extra Cartage An additional charge applies for loads delivered more than 15km from the nearest plant.

Record No. 5QFC111 Concrete Surcharge Summary, ©2014 Excel Concrete Pty Ltd Brisbane, Gold Coast, Sunshine Coast Prices DO NOT stinclude 10% G.S.T. Effective 1 April 2014

Tags:

  Summary, Concrete, Surcharges, Concrete surcharge summary

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Concrete Surcharge Summary

1 Record No. 5 QFC111 Concrete Surcharge Summary , 2014 Excel Concrete Pty Ltd Brisbane, Gold Coast, Sunshine Coast Prices DO NOT include 10% Effective 1st April 2014 ITEM CONDITION CHARGE Waiting Time Waiting Time applies after 30minutes on site. No Waiting Time is payable for the first 30 minutes of any delivery. $ per minute For a truck detained on site beyond 30 minutes outside Normal Hours of Operation $ per minute Extra Cartage An additional charge applies for loads delivered more than 15km from the nearest plant.

2 $ per km per m Minimum Cartage on Small Loads A fee applies for a delivered load size < 4m3 and is calculated on the undelivered part of the load size up to 4m3 for all truck types including deliveries in mini mixers (eg. Load size of leaves by $ ; $ plus GST) $ per undelivered m Environment Levy The disposal fee in most cases has been replaced by the application of an environmental levy. Existing contracts and contracts with special provisions may see the fee waived in favour of the Disposal Fee. $ / m Disposal Fee Where the Environmental Levy does not apply, this fee applies to > Concrete returned from site and covers the cost of disposal and returned cartage.

3 No fee will be charged for < Concrete returned. $ / m (or part thereof) After Normal Operating Hours Normal working hours are Monday to Friday 6am to 4pm Note: rates are calculated from On-site times 1. Monday Friday 2. Monday Friday 3. Monday Friday 4. Saturday 5. Saturday 6. Saturday 7. Sunday 8. Public Holidays - - (Sat ) noon - midnight $ / m3, min of 4m3/load $ / m , min of 4m /load $ /m3, min of 4m3/load $ / m3, min of 4m3/load $ / m , min of 4m /load $ / m , min of 4m /load $ / m , min of 4m /load $ / m , min of 4m /load Plant Opening Fee (min 48 hrs notice required) Fee to open the plant outside normal operating hours ( After Hours surcharges also apply) $ per plant Standby Applies where deliveries scheduled out of hours are cancelled, interrupted or delayed for in excess of one hour from the original scheduled start time.

4 $ / truck / hour Cancellation Fee A fee will be charged when a pour is cancelled or postponed by more than 3hrs with insufficient notice. The deadline for notice is of the previous working day. Pours < 75m3 $ Pours > 75m3 $ Blowback (Excel does not permit this) A fee is charged to cover return of waste Concrete from the pump, discharged into the bowl of a Concrete truck, Subject to approval and in conjunction to our OH&S requirements Please note additional charges as per Disposal Fees will also apply. $ per event Administration fee Printing of replacement delivery dockets and invoices on request. $ / copy 10mm Aggregate Concrete with maximum 10mm aggregate will incur an additional cost $ /m3 7mm Aggregate Concrete with maximum 7mm aggregate will incur an additional cost $ /m3 Slump modification For slump requested in excess of 80mm, a Surcharge applies per 20mm slump increase.

5 No deductions apply for slump decreases. $ /m3 / 20mm Temperature Control Concrete supplied is not guaranteed to comply with temperature requirements of a specification. Temperature control can be supplied however only at the request of the customer. Price on application Handling, mixing & washout fee for oxides, fibre Manual handling and mixing and washout of oxides and fibre products of customer supplied products $ / load Accelerator Charges (speeds up setting time of the Concrete ) Low dose Medium dose High dose $ / m3 $ / m3 $ / m3 Retarder (slows down the setting time of the Concrete ) Low dose Medium dose High dose $ / m3 $ / m3 $ / m3 Concrete Surcharge Summary Excel Concrete Pty Ltd, ABN 74 010 891 773