Construction Methodology Report

Placement of the embankment fill material will work progressively from the nearest hardstand area, either a haul road or local road. Where possible, the permanent stormwater drainage, including wetland and flood offset storage areas will be formed and installed ahead to enable the drainage features to be used for erosion and sediment control.