COVID-19 (Temporary Measures) Act 2020 Part 8A & 8B Guide
COVID-19 (Temporary Measures) Act 2020 – Part 8A and Part 8B Guide 1 Third update 27 Dec 2021 1. INTRODUCTION 1.1 Background The COVID-19 pandemic has resulted in delays and increased costs for construction projects,
Tags:
Project, Measure, Temporary, Temporary measures
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
CODE ON ENVELOPE THERMAL PERFORMANCE FOR …
www1.bca.gov.sgA2 Thermal Transmittance (U-value) 15 A3 Surface Air Film Resistance 15 A4 Air Space Resistance 16 . 3 APPENDIX B - Shading Coefficient of Sun Shading Devices B1 Basic Solar Data B1.1 Solar geometry 18 ... B2.3 Determination of ‘G’ factor 22 B3 Examples B3.1 Example A – finding the effective shading coefficient 26 ...
SPECIFIC REGISTRATION REQUIREMENTS FOR MECHANICAL ...
www1.bca.gov.sgMechanical, Electrical/Electronics Engineering or equivalent awarded by BCA Academy, Nanyang Polytechnic, Ngee Ann Polytechnic, Republic Polytechnic, Singapore Polytechnic, Temasek Polytechnic or such other diplomas or qualifications as approved by BCA from time to time. For ME05, an EMA electrician can be considered as one of the “T” for ...
Handbook to BC1: 2012
www1.bca.gov.sgTable 3.2f Design Strength of American (AWS) Stud Shear Connectors 11 Table 3.3a Design Strength of Japanese (JIS) Structural Steels 11 Table 3.3b Design Strength of Japanese (JIS) Non-Preloaded Bolts 12 Table 3.3c Design Strength of Japanese (JIS) Preloaded Bolts 12
CODE OF PRACTICE ON Buildability
www1.bca.gov.sgContents CODE OF PRACTICE Introduction 1 1 Scope 2 ... The following Act and Regulations have relevance: a. The Building Control Act. b. ... The various types of building development are categorised in Table A. Buildings listed
Guide on FM Procurement
www1.bca.gov.sgProcurement is a key enabler to FM transformation and in creating lead demand in the public sector. The FMIC’s Procurement Taskforce, set up to review and strengthen FM procurement practices, has consulted the Centre of Excellence for FM (JTC), various Government Procuring Entities (GPEs) and FM providers to prepare this Guide on FM Procurement.
Circular on Further Simplified Claim Process for ...
www1.bca.gov.sgTo: All firms registered in BCA’s Contractors Registration System (CRS) Circular on Further Simplified Claim Process for Prolongation Costs in Public Sector Construction Contracts due to COVID-19 Events Further to the BCA circular dated 27 …
System, Registration, Contractor, Contractors registration system
GREEN MARK AWARD
www1.bca.gov.sgCentral Library at National University of Singapore ... SUPER LOW ENERGY (SLE) BUILDINGS . 7 CONTENT PAGE Tiong Bahru Market Ulu Pandan Bus Depot (SBST) United World College of South East Asia ... 7 north coast 79 Anson Road Admirax …
UPDATED GUIDANCE NOTE ON IMPROVING VENTILATION …
www1.bca.gov.sgoutdoor air quality is poor. Air-conditioning should be reduced or turned off when doors and/or windows are opened. b. Consider adding dedicated outdoor air supply and/or exhaust7. c. Operate exhaust fans (e.g. in toilets, kitchens) at full capacity to expel air from indoor spaces. Keep windows or other openings (e.g. back door)
STRATA MANAGEMENT GUIDE : 1
www1.bca.gov.sgThe MC, in respect of a strata title plan, is composed of the subsidiary proprietors (SPs) within the specific strata title plan. A SP is a purchaser to whom ownership of a unit has been transferred, as shown on the subsidiary strata certificate of title. 1.2 The Building Maintenance and Strata Management Act (BMSMA) is designed to
Management, Strata, Strata management, Strata management act
Ops START - bca.gov.sg
www1.bca.gov.sg1. Tilt the buffer bottle 2. Fill the extraction tube with buffer fluid until it reaches the fill-line of the extraction tube 3. Close the nozzle (blue cap) Test cartridge, swab stick, and extraction tube with buffer solution to be provided to the employee to conduct self-swabbing.
Related documents
Contracts Manager The Role: Key Responsibilities
www.barhale.co.ukPlan projects and ensure they are programmed to a level of detail necessary for the site ... originally formed in 1980 as a specialist tunnelling contractor diversifying over the years into various civil engineering areas. Barhale works UK-wide across the water, transport, energy
Hoek-Brown failure criterion – 2002 Edition
www.rocscience.coma large number of projects around the world. While, in general, it has been found to be satisfactory, there are ... tunnelling problems (Carranza-Torres and Fairhurst, [11]) Bray. Hoek [13] suggested that the cohesive strength determined by fitting a tangent to the ...
BID TABULATION FY 16 WATER & SEWER EXTENSION / …
charlottenc.govtunnelling 21: for installing 48' tunnel (12 gauge), anchoring the carrier pipe, and and necessary mortar end sealing as specified, complete in place. the unit price bid shall not be less than $700.00/lf. a 48-inch tunnel 20: lf $800.00
BEST PRACTICE GUIDE LIFTING OPERATIONS
learninglegacy.crossrail.co.ukIn tunnelling environments such as Crossrail, there are further key roles which will interface with lifting operations: • Pit boss – Overall responsibility for ensuring the safe and efficient execution of works within an area and liaising with Shift Managers, Shift Engineers, Lead Miners and other Pit Bosses. • Lead miners – Responsible
Construction Equipment - IBEF
www.ibef.orgexcavators is largely driven by irrigation projects. Increased privatisation of mining and capacity augmentation in cement industry has propelled the growth for larger excavators. The key players in this sector are Telcon, L&T - Komatsu, Volvo, CAT and JCB. Telcon is the market leader with about 50 per cent of the market.
Geotechnical Design Standard – Minimum Requirements
www.tmr.qld.gov.aufor new infrastructure projects, the minimum design life shall be 100 years. Refer Clause 6 of this document for the required design life for remediation of existing slopes and embankments. 2 Embankments 2.1 General requirements Notwithstanding the requirements stipulated in the department’s Technical Specification MRTS04 General Earthworks