DIVISION 1 00 -- GENERAL PROVISIONS

TOC 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications DIVISION 1 00 -- GENERAL PROVISIONS section 101 -- DEFINITIONS AND TERMS section 102 -- BIDDING REQUIREMENTS AND CONDITIONS section 103 -- AWARD AND EXECUTION OF CONTRACT section 104 -- SCOPE OF WORK section 105 -- control OF THE WORK section 106 -- control OF MATERIAL section 107 -- LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC section 108 -- PROSECUTION AND PROGRESS section 109 -- MEASUREMENT AND PAYMENT DIVISION 2 00 -- EARTHWORK section 201 -- CLEARING AND GRUBBING section 202 -- REMOVAL OF STRUCTURES AND OBSTRUCTIONS section 203 -- EXCAVATION AND EMBANKMENT section 206 -- STRUCTURE EXCAVATION FOR PIPES AND OTHER MINOR STRUCTURES section 207 -- CHANNEL EXCAVATION section 209 -- GRANULAR BACKFILL section 211 -- VIBRATION MONITORING section 214 -- FINE GRADING DIVISION 3 00 -- BASE COURSES section 304 -- AGGREGATE BASE COURSE section 306 -- RECLAIMED STABILIZED BASE DIVISION 4 00 - PAVEMENTS section 401 -- PLANT MIX PAVEMENTS GENERAL section 403 -- HOT BITUMINOUS PAVEMENT section 410 -- BITUMINOUS

section 625 -- light pole bases section 628 -- sawed pavement section 632 -- retroreflective pavement markings section 641 -- loam section 642 -- limestone section 643 -- fertilizer for grasses section 644 -- grass seed section 645 -- erosion control section 646 -- turf establishment section 647 -- humus section 648 -- sod section 650 ...

Tags:

  Section, Control, Erosion, Section 628, Section erosion control

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of DIVISION 1 00 -- GENERAL PROVISIONS

1 TOC 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications DIVISION 1 00 -- GENERAL PROVISIONS section 101 -- DEFINITIONS AND TERMS section 102 -- BIDDING REQUIREMENTS AND CONDITIONS section 103 -- AWARD AND EXECUTION OF CONTRACT section 104 -- SCOPE OF WORK section 105 -- control OF THE WORK section 106 -- control OF MATERIAL section 107 -- LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC section 108 -- PROSECUTION AND PROGRESS section 109 -- MEASUREMENT AND PAYMENT DIVISION 2 00 -- EARTHWORK section 201 -- CLEARING AND GRUBBING section 202 -- REMOVAL OF STRUCTURES AND OBSTRUCTIONS section 203 -- EXCAVATION AND EMBANKMENT section 206 -- STRUCTURE EXCAVATION FOR PIPES AND OTHER MINOR STRUCTURES section 207 -- CHANNEL EXCAVATION section 209 -- GRANULAR BACKFILL section 211 -- VIBRATION MONITORING section 214 -- FINE GRADING DIVISION 3 00 -- BASE COURSES section 304 -- AGGREGATE BASE COURSE section 306 -- RECLAIMED STABILIZED BASE DIVISION 4 00 - PAVEMENTS section 401 -- PLANT MIX PAVEMENTS GENERAL section 403 -- HOT BITUMINOUS PAVEMENT section 410 -- BITUMINOUS SURFACE TREATMENT section 411 -- PLANT MIX SURFACE TREATMENT section 413 -- HOT-POURED CRACK SEALANT section 417 -- COLD PLANING BITUMINOUS SURFACES DIVISION 5 00 - STRUCTURES section 501 -- TEMPORARY BRIDGE section 502 -- REMOVAL OF EXISTING BRIDGE STRUCTURE section 503 -- COFFERDAMS AND WATER DIVERSION STRUCTURES section 504 -- BRIDGE EXCAVATION section 506 -- SHEET PILING section 508.

2 STRUCTURAL FILL section 510 -- BEARING PILES section 511 -- PREPARATION FOR CONCRETE BRIDGE DECK REPAIRS section 512 -- PREPARATION FOR CONCRETE REPAIRS section 520 -- PORTLAND CEMENT CONCRETE section 528 -- PRESTRESSED CONCRETE MEMBERS section 530 -- WATERPROOFING CONCRETE SURFACES section 534 -- WATER REPELLENT section 536 -- EPOXY COATING FOR CONCRETE section 538 -- BARRIER MEMBRANE section 541 -- WATERSTOPS section 544 REINFORCEMENT FOR CONCRETE section 547 -- SHEAR CONNECTORS section 548 -- ELASTOMERIC BEARINGS section 550 -- STRUCTURAL STEEL section 556 -- PAINTING EXISTING STRUCTURAL STEEL section 559 ASPHALTIC PLUG EXPANSION JOINT, section 560 -- PREFABRICATED COMPRESSION SEAL EXPANSION JOINT section 561 -- PREFABRICATED EXPANSION JOINT section 562 -- SILICONE JOINT SEALANT section 563 -- BRIDGE RAIL section 565 -- BRIDGE APPROACH RAIL section 568 -- STRUCTURAL TIMBER section 570 -- STONE MASONRY section 572 STONE WALL section 582 -- SLOPE PAVING section 583 -- RIPRAP section 585 -- STONE FILL TOC 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications section 591 -- STRUCTURAL PLATE PIPES, PIPE-ARCHES, AND ARCHES section 593 -- GEOTEXTILE DIVISION 6 00 -- INCIDENTAL CONSTRUCTION section 603 -- CULVERTS AND STORM DRAINS section 604 -- CATCH BASINS, DROP INLETS.

3 AND MANHOLES section 605 -- UNDERDRAINS section 606 -- GUARDRAIL section 607 FENCES section 608 -- SIDEWALKS section 609 -- CURBS section 614 -- ELECTRICAL CONDUIT section 615 -- TRAFFIC SIGNS section 616 -- TRAFFIC SIGNALS section 618 -- UNIFORMED OFFICERS AND FLAGGERS section 619 -- MAINTENANCE OF TRAFFIC section 621 -- DELINEATORS section 622 -- MARKERS AND BOUNDS section 624 -- RAILROAD PROTECTION section 625 -- LIGHT POLE BASES section 628 -- SAWED PAVEMENT section 632 -- RETROREFLECTIVE PAVEMENT MARKINGS section 641 -- LOAM section 642 -- LIMESTONE section 643 -- FERTILIZER FOR GRASSES section 644 -- GRASS SEED section 645 -- erosion control section 646 -- TURF ESTABLISHMENT section 647 -- HUMUS section 648 -- SOD section 650 -- PLANTING - GENERAL section 651 -- EVERGREEN TREES SECTIONS 652 AND 653 -- DECIDUOUS TREES section 654 -- EVERGREEN SHRUBS SECTIONS 655 AND 656 -- DECIDUOUS SHRUBS section 657 -- VINES AND GROUND COVERS section 658 -- TRANSPLANTING PLANT MATERIAL section 692 -- MOBILIZATION section 693 -- TRAINING PROGRAMS section 698 -- FIELD FACILITIES section 699 -- MISCELLANEOUS TEMPORARY erosion AND SEDIMENT control DIVISION 7 00 -- MATERIALS section 702 -- BITUMINOUS MATERIALS section 703 AGGREGATES section 707 -- CEMENT MORTAR section 708 -- PAINTS section 716 -- WELDING OF ALUMINUM ALLOYS FOR HIGHWAY STRUCTURES section 718 -- RETROREFLECTIVE SHEETING section 101 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications DIVISION 100.

4 GENERAL PROVISIONS section 101 -- DEFINITIONS AND TERMS section 102 -- BIDDING REQUIREMENTS AND CONDITIONS section 103 -- AWARD AND EXECUTION OF CONTRACT section 104 -- SCOPE OF WORK section 105 -- control OF THE WORK section 106 -- control OF MATERIAL section 107 -- LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC section 108 -- PROSECUTION AND PROGRESS section 109 -- MEASUREMENT AND PAYMENT section 101 -- DEFINITIONS AND TERMS GENERAL . The titles and headings of the Sections and Subsections are intended for convenience and do not bear on the meaning of the text. When a publication is specified, it refers to the most recent date of issue, including all current updates and official interpretations, prior to the date of Proposal Bid opening for the Project unless the issue has a specific date or year specified.

5 Wherever the following abbreviations, terms, or pronouns are used in the Contract, the intent and meaning shall be interpreted as follows: Abbreviations: AAN American Association of Nurserymen AAR Association of American Railroads AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AGC Associated GENERAL Contractors of America AIA American Institute of Architects AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute ARA American Railway Association AREMA American Railway Engineering Maintenance-of-Way Association ASCE American Society of Civil Engineers ASLA American Society of Landscape Architects ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWPA American Wood-Preservers Association AWWA American Water Works Association AWS American Welding Society CFR Code of Federal

6 Regulations CGP Construction GENERAL Permit CPM Critical Path Method EPA Environmental Protection Agency FHWA Federal Highway Administration FSS Federal Specifications and Standards, GENERAL Services Administration LRFD Load and Resistance Factor Design MUTCD Manual on Uniform Traffic control Devices NEC National Electric Code NEMA National Electrical Manufacturers Association NEPCOAT North East Protective Coating Committee section 101 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications NTPEP National Transportation Product Evaluation Program NHDOT The State of New Hampshire Department of Transportation NPDES National Pollutant Discharge Elimination system OSHA Occupational Safety and Health Administration RSA The New Hampshire Revised Statutes Annotated.

7 1955 together with all revisions amending same to date of invitation for bids SAE Society of Automotive Engineers SSPC Steel Structures Painting Council UL Underwriter s Laboratory USACOE United States Army Corps of Engineer Accept or Acceptance. Unless otherwise explicitly stated, these words refer to the Engineer's acceptance of work or materials for the purpose of initiating a Progress Payment(s) to the Contractor. Final Acceptance. The formal written acceptance by the Commissioner indicating that the Contractor has complied with all requirements of the Contract and it has been completed in all respects. Adjustment. Increase or decrease in the Contract Time or Contract Amount in accordance with or respectively. Advertisement. A public announcement inviting bids for work to be performed or materials to be furnished.

8 Angle of Crossing. The right or acute angle formed by the intersection of the centerline of the upper roadway with a line parallel to the face of the abutment of a bridge or with the centerline of a culvert. Approved Material. Material approved by the Engineer for use in the work. Award. The acceptance of a proposal by the Department pending Governor and Council approval. Base Course. One or more layers of specified or selected material of designed thickness placed on a properly prepared subbase or subgrade to support a surface course. Bidder. An individual, partnership, firm, corporation, or any combination thereof, or joint venture, submitting a Proposal. Bid Bond. See Proposal Guaranty. See Bid (Total). Total dollar amount of the Proposal. Bid Documentation. All writings, working papers, computer printouts, charts, and all other data or compilations of data that contain or reflect information or calculations used by the Bidder to determine the Total Bid and Item Bid Price indicated in a submitted and opened Proposal, including but not limited to information relating to the determination and application of: Equipment rates Overhead rates and related time schedules Labor rates Efficiency or productivity factors Arithmetic extensions Subcontractor and material supplier quotes Any manuals standard to the industry that are used by the Bidder in determining the Proposal may be included in the bid documentation by reference and shall show the name and date of the publication and the publisher.

9 The term Bid Documentation does not include documents provided by the Department for the Bidder s use in the preparation of the Proposal. Bid Schedule. The schedule included in the Proposal, containing the estimated quantities of contract pay items for which Item Bid Prices are invited. Bridge. As provided by RSA 234:2, a structure having a clear span of 10 ft. or more measured along the center line of the roadway at the elevation of the bridge seats, spanning a water course or other opening or obstruction. Calendar Day. A day shown on the calendar. Cement. Unless otherwise designated, this term will refer to Portland cement. section 101 2016 NHDOT Go To = TOC DIVISION 100 DIVISION 200 DIVISION 300 DIVISION 400 Standard DIVISION 500 DIVISION 600 DIVISION 700 Specifications Certificate of Compliance.

10 A document in the format prescribed in the Contract certifying that material incorporated in the Work complies with the Contract. Change Order. A revision to the Contract issued after Award. The Change Order establishes the increase or decrease to the Contract Quantities, Contract Amount or Contract Time, if any, for the revision in accordance with Commissioner. The Commissioner of The State of New Hampshire Department of Transportation. Complete in Place. All work indicated to be completed as part of a Contract pay item except as may be otherwise specified under the Method of Measurement or Basis of Payment. Completion (Project). Completion of the Project occurs when the Contractor has completed all work required by the Contract; has satisfactorily executed and delivered all documents, certificates, and proofs of compliance required by the Contract, and has received Final Acceptance from the Commissioner.