G45 VENTED GAS LOG SETS - RH Peterson Co.
REV 8 - 1908300800 1 L-A2-208 Robert H. Peterson Co. † 14724 East Proctor Avenue † City of Industry, CA 91746 The Real Fyre gas log set is to be installed only in a solid-fuel burning fi replace with a working fl ue and constructed of noncombustible material.The installation,
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
INSTALLATION AND OWNER’S MANUAL - rhpeterson.com
www.rhpeterson.comINSTALLATION AND OWNER’S MANUAL INSTALLER: Leave these instructions with consumer. CONSUMER: Retain for future reference. WARNING: Improper installation, adjustment, alteration, service, or maintenance can cause injury or property damage. For proper installation,
Aurora Digital Thermometer - rhpeterson.com
www.rhpeterson.comThe optional digital thermometer is for oven and meat probe temperature monitoring, and timed cooking. Pressing the power button will turn on the thermometer. The thermometer will automatically shut off after 5 minutes if no temperature change is detected. The thermometer is located on the control panel between the control knobs.
INSTALLATION AND OWNER’S MANUAL - Fitness Showcase
www.rhpeterson.comThis appliance and its dedicated manual shutoff valve must be disconnected from the gas-supply piping system when testing the system at pressures in excess of ½ psig (3.5 kPa). This appliance must be isolated from the gas- ... INSTALLATION AND OWNER’S MANUAL POST OUTDOOR GAS GRILLS
VR1A / VR2A Remote Quick Start Guide - Fitness Showcase
www.rhpeterson.comREV 0 - 1706151435 2 L-A2-391 III CONNECT TOV ALVE Connecting to a 15 Valve Connecting to a 17 Valve Remote Receiver (Remote System) Valve (Burner System) † …
Remote Electronic Ignition and Control System
www.rhpeterson.comREV 3 - 1706060955 2 L-F2-108 APPLICATION The remote system is a battery-powered electronic remote ignition and control system for gas appliances with pilot burners and ODS systems.
BUILT-IN OUTDOOR GAS GRILLS - Fitness Showcase
www.rhpeterson.com4 1. The outdoor appliance and surrounding area MUST remain clear of flammable substances such as gasoline , yard debris, wood, etc. Maintain a minimum horizontal
Related documents
Guidelines for the Design of Buried Steel Pipe July 2001
www.americanlifelinesalliance.comS. Peterson Lakehead Pipe Line Co., Bay City, MI M. Rosenfeld Kiefner & Associates, Worthington, OH J. E. Thomas S/D Engineers, Pittsburgh, PA. Guidelines for the Design of Buried Steel Pipe July 2001 ii Table of Contents ... Guidelines for the Design of …
Reinforcing Steel Placement Handbook
iowadot.govDick Peterson, Facilitator The team met weekly from late February through March. Following a brief “working in teams” training session during the first meeting, dug into their team’s assignment. The NEITC Reinforcing Steel Placement Process Improvement Team recommends adoption of …
Example Geotechnical Report - Peterson Construction
petersonconstruction.comThe structure will be of steel frame construction supported on a reinforced concrete foundation system, concrete slab-on-grade floors. Finished floor elevation Less than 2 feet above grade (assumed) Geotechnical Engineering Report Proposed Dollar General Warren, Minnesota
Trump’s Trade War Timeline: An Up-to-Date Guide
www.piie.com4 PETERSON INSTITUTE FOR INTERNATIONAL ECONOMICS TRADE AND INVESTMENT POLICY WATCH BLOG Tariffs Go Into Effect March 23, 2018 Trump’s steel and aluminum tariffs go into effect with exemptions for selected countries.
Code of Standard Practice for Steel Buildings and Bridges
www.aisc.orgApr 14, 2010 · Code of Standard Practice for Steel Buildings and Bridges, April 14, 2010 AMERICAN INSTITUTE OF STEEL CONSTRUCTION 16.3-iii PREFACE As in any industry, trade practices have developed among those that are involved in the design, purchase, fabrication and erection of structural steel. This Code provides a useful
Practices, Standards, Building, Steel, Standard practice for steel buildings and
TRANSMISSION LINE PARAMETERS - Baylor University
web.ecs.baylor.eduthe steel core alone during erection. A small annu-lar Gap exists between a high-strength steel core and the first layer of trapezoidal-shaped aluminum strands, which allows this to be achieved. The result is a conductor with a knee-point at the erection temperature. Above this, thermal expansion is that of steel (11.5 microstrain per Kelvin ...
SLOPE STABILITY ANALYSIS REPORT
semspub.epa.govJan 29, 2004 · Peterson/Puritan OU2 -Stability Analysis December 2003 Shield Engineering, Inc. Page 5 of8 . Figure 3 illustrates the location of the two (2) slope sections that were analyzed for slope stability. The slopes were chosen based on proximity to boring locations and also areas of steep slope to yield worst case scenario conditions.