Example: air traffic controller

Impression Rail Express - TimberTech

GuideAluminum Posts ..4 Level Panels ..8 Stair Panels ..10 Gate Kits ..13 Aluminum RailingImpression rail ExpressPage 2 Installing Impression rail ExpressAluminum Railing SystemImportant Information Please read all instructions completely before starting any part of the installation. Always make sure to visit to ensure you are viewing the most current installation instructions, care and cleaning, technical information and more. Impression rail Express should be installed using the same good building principles used to install wood, composite, or metal railing and in accordance with the local building codes and the installation guidelines included below. The AZEK Co. LLC accepts no liability or responsibility for the improper installation of this product. Impression rail Express may not be suitable for every application and it is the sole responsibility of the installer to be sure that Impression rail is fit for the intended use.

ut and Install Top and ottom Rail Snaps • Measure between posts at the top and bottom. (Dia.#5) • For Continuous Top Rail, measure opening from 3" post to 3" post. • Cut top & bottom snap covers 1/16" less than opening. • Clean cut areas and apply touch-up paint on all exposed metal. • Snap each rail snap over the corresponding rail

Tags:

  Rail

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Impression Rail Express - TimberTech

1 GuideAluminum Posts ..4 Level Panels ..8 Stair Panels ..10 Gate Kits ..13 Aluminum RailingImpression rail ExpressPage 2 Installing Impression rail ExpressAluminum Railing SystemImportant Information Please read all instructions completely before starting any part of the installation. Always make sure to visit to ensure you are viewing the most current installation instructions, care and cleaning, technical information and more. Impression rail Express should be installed using the same good building principles used to install wood, composite, or metal railing and in accordance with the local building codes and the installation guidelines included below. The AZEK Co. LLC accepts no liability or responsibility for the improper installation of this product. Impression rail Express may not be suitable for every application and it is the sole responsibility of the installer to be sure that Impression rail is fit for the intended use.

2 Since all installations are unique, it is also the installer s responsibility to determine specific requirements in regards to each rail application. The AZEK Co. LLC recommends that all applications be reviewed by a licensed architect, engineer or local building official before installation. If you have any questions or need further assistance, please call AZEK Customer Service at 877-ASK-AZEK (877-275-2935), or visit our website at Impression rail Express is tested as a whole system and should be used that way. It is not intended to be used in conjunction with other railing systems or fasteners. The following Installation Guidelines are applicable for installation of Impression rail Express only. IMPORTANT: Make sure the DRIVE TOOL/DRILL is configured or set to use the SCREW setting when driving and/or tightening all FASTENERS.

3 SAFETY: Always wear goggles when handling, cutting, drilling and fastening materials. Failure to install this product in accordance with applicable building codes and Impression rail Express s written rail Install Guide may lead to personal injury, affect rail system performance and void the product warranty. The buildup or generation of static electricity is a naturally occurring phenomenon in many plastic based products such as carpeting, upholstery, and clothing, and can occur on alternative decking under certain environmental conditions. This static electricity can discharge once contact is made with hardware, railing, or other conductors of : IF INSTALLING POST LIGHTING, WIRING MUST BE INSTALLED PRIOR TO SECURING POSTS TO DECK/STAIR SURFACE AND INSTALLING TOP rail is the responsibility of the installer to meet all local code requirements and obtain all required building permits.

4 The installer should determine and implement appropriate installation techniques for each installation situation. AZEK Co. LLC or its reseller shall not be held responsible for improper or unsafe 3 Installing Impression rail ExpressAluminum Railing SystemImportant Note:Actual Level Panel Lengths Are As Follows: 6' Panels = " 8' Panels = " 3" posts are required to reach 6' & 8' lengthsVisit to view installation your local building codes for guard and handrail requirements. Important Note:Suggested Tools: Appropriate fasteners for mounting posts to deck Miter saw with carbide-tipped non-ferrous blade Cordless drill Tape measurePrior to construction, check with your local regulatory agency for special code requirements in your railing height is 36" or 42". Post spans will vary depending on job site conditions.

5 Never span more than 8' on-center between railing posts. Spans longer than 12' in length will require reduced post spans. For all other applications, consult a design professional or an AZEK railing representative for more information. Read instructions completely to get an understanding of how the product goes together and how each piece affects the other. Level Power cords, drop sheets and safety glasses 3/16" Drill bit 6" #2 Square drive bit Installation jig (optional)Page 4 Installing Aluminum PostsDetermine All osts Needed and repare (end, center or corner) Important Note:3" posts are required to reach 6' and 8' lengths. 2" posts must be set in-line to panel. Do not install post caps and vinyl post base covers until railing assembly is Lower Deck rail Clips Two Options: Option A - When No Installation Jig Is Available Measure 2 7/8" from top of casting shoulder and place a pencil mark for location of the top edge of the rail clip.

6 (Dia. #1) Center clip on post and secure with (2) - #8x3/4" self-drilling screws. Clips are included in the Panel B - Using Installation Jig (Sold separately. Accessory pack includes Installation Jig and Touch-up paint.) Place Installation Jig (w/arrow facing base plate) on top of base plate upper edge. (Dia. #2) Place clip in hole and fasten with (2) - #8x3/4" self-drilling screws. Clips are included in the Panel #1 Dia. #42 CapSquare PostPost Base Plate Vinyl Cover*Do not install until railing assembly is EdgeJoist Stringer2x6 Blocking2x6 Cross BlockRest Installation Jig on Base Plate Arrow DownPlace Clip in hole, hold clip firmly while installing (2) Self-Drilling Screws. Dia. #2 Shims below base2x6 Blocking4X 3/8"x6" construction lag screws (sold separately)*Verify local code requirements for post attachment #3B(SIDE VIEW)Dia.

7 #3A(TOP VIEW) o to Secure osts to Dec Install proper post blocking (Dia. #3A & 3B). Use proper attachment screws or anchors shown in diagram. (Hardware for post attachment are not provided with the posts.) With 3/16 drill bit, pre-drill through deck boards and into blocking. (Dia. #3C) Drill a 5/8" hole in center of four deck screw holes for lighting wires (optional). Level and plumb post using shims. Secure posts to deck frame with suggested screws. (Dia. #3B)*Verify local code requirements for post attachment hardware. Install post caps (after panels are installed). (Dia. #4)Pre-drill 3/16" holes for post attachment fasteners (sold separately).5/8" hole for lighting wires (optional)Dia. #3C(TOP VIEW)Page 5 Installing Aluminum PostsInstall Stair End osts (if applicable) Temporarily install end stair post so rail centerline aligns with top stair posts installed in Step 1 (if applicable).

8 Recommended post installation locations are shown. (Dia. #5) Confirm with local code officials before installing stair rail sections or stair rail posts to ensure compliance with local code End osts (if applicable)Install posts at all end locations with maximum gap between post and wall to be less than a 4" opening. (Dia. #6)Install degree orner ostsPosition post on same 3" centerline (typical) and temporarily fasten using a single fastener through base plate mounting hole. (Dia. #7)345 Dia. #5 Dia. #6 OPENINGLESS THAN 4"3" CENTERLINETYPICALDECKEDGEBUILDING WALLLOCATE ENDPOSTTOP VIEW3" CENTERLINETYPICALLOCATE 90 CORNER POST3" CENTERLINETYPICALDECKEDGEDia. #7 Important Note:3" posts are required at all transitions. 2" posts may not be used to start/end a run or to form a "3"3" TYPICAL3B DECKSURFACESTAIR DOWN3" TOP STAIR POSTTEMPORARILY INSTALL 3" BOTTOM STAIR END POST ALIGNED WITH TOP STAIR END POST (REFER TO STAIR INSTRUCTIONS)Page 6 Install orner osts(Post to be installed at to accommodate a 45 angle.)

9 Position post on same 3" centerline (typical) and temporarily fasten to deck surface. Use one Panel Attach Kit (purchased separately) to install 45 corner posts. (Dia. #8)Determine enter ost ocationsLoosely lay center post over deck edge and adjust as required to determine final center post mounting locations. (Dia. #9 & #10)67 Dia. #8 Dia. #9 Dia. #10 PLAN VIEWCLOSE UPVIEWCENTER LINEI nstalling Aluminum PostsDia. #8 TOP VIEWPOST DISSECTSDECK ANGLETYPICALDECKEDGE3" CENTERLINETYPICAL3" CENTERLINETYPICALLOCATE 45 ANGLED POSTPage 7 STAIR CROSSOVER BRACKETPOST BASE PLATE VINYL COVERPOST EXTRUSIONCLIPDia. #12 BDia. #12 DInstall rosso er rac ets on osts With 6" #2 square drive bit, fasten straight crossover bracket (included) into post with (2) - # " Self-Drilling Screws. (Dia. #12A & #12B) NOTE: Self-Drilling Screws must be installed in screw chases in-line with panels.

10 With 6" #2 square drive bit, fasten H-channel to straight and stair crossover brackets with (4) - #8x3/4" Self-Drilling Screws. (Dia. #12C & #12D) Repeat for lower clips. Install base plate vinyl cover only after railing assembly is completed. (Dia. #4)89 Installing Aluminum PostsDia. #113" CENTERLINE TYPICALDECK EDGES ecure osts to Dec (center only) For continuous top rail systems, install 2" posts centered between 3" end and corner : 2" Posts must be installed with center screw chases in-line with panel (Dia. #11). Follow instructions in step 2 (Dia. #3A to Dia. #4).Important Note:3" posts are required at all transitions. 2" posts may not be used to start/end a run or to form a CROSSOVER BRACKETPOST BASE PLATE VINYL COVER*DO NOT INSTALL UNTIL RAILING ASSEMBLY IS EXTRUSIONCLIPDia. #12 ADia. #12 CLEVEL PANELSSTAIR PANELSPage 8 Dia.


Related search queries