Information Sheet - norbord.com
Installation – Follow the APA Engineered Wood Construction Guide E30 and/or your local building code or design professional’s instructions. All panels must be spaced 1/8” along all edges (lightly butt the T&G edges and space square edges 1/8”).
Tags:
Information
Domain:
Source:
Link to this page:
Related search queries
APA Engineer Reference Materials April 2016, Construction, Engineered Wood Construction Guide, CONSTRUCTION GUIDE, Wood, Design/Construction Guide: Diaphragms and Shear, Engineered Wood, Guide, Installers Guide for Residential Construction, Concrete forming, Concrete form-ing, Construction Guide: Post-Frame, Construction Guide Post-Frame, Engineered Wood Products FIRE DESIGN AND, Fire Design and Installation Guide, Engineered construction, ASD/LRFD MANUAL, University of Washington, Engineered Wood Construction