INTRODUCTION TO CONSTRUCTION WORK

INTRODUCTION to CONSTRUCTION Work :: 254 INTRODUCTION TOCONSTRUCTION WORK INTRODUCTIONThe structure of the building is divided into two parts. The sub-structure and thesuper structure. The lower portion of the building which transmits the load ofthe super structure to the foundation soil is called sub-structure and the portionof the building which is above the substructure is called super structure. Theweight of superstructure is borne by the foundation hence the foundation shouldbe strong enough to carry the load of the super structure.

The height of the masonry pillars will be equal to the height of the plinth. The level of the floor is called plinth level. 9. All the lengths and distances are measured with the help of standard chain or tape (steel) 4.9 WHAT HAVE YOU LEARNT • Requirement of foundation is extremely important and its use and construction should be according ...

Tags:

  Plinth

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of INTRODUCTION TO CONSTRUCTION WORK

1 INTRODUCTION to CONSTRUCTION Work :: 254 INTRODUCTION TOCONSTRUCTION WORK INTRODUCTIONThe structure of the building is divided into two parts. The sub-structure and thesuper structure. The lower portion of the building which transmits the load ofthe super structure to the foundation soil is called sub-structure and the portionof the building which is above the substructure is called super structure. Theweight of superstructure is borne by the foundation hence the foundation shouldbe strong enough to carry the load of the super structure.

2 OBJECTIVESA fter going through this lesson you will be able to: describe the working of various equipments used in CONSTRUCTION work; explain the importance of foundation; explain about the super structure and its importance; enumerate the type of CONSTRUCTION ; describe the method of laying out the proposed CONSTRUCTION plan. REQUIREMENTS OF foundation of sub-structure distributes the load of the building evenly26 :: Certificate in CONSTRUCTION Supervision (CIVIL)on the soil in such a way that at not below the foundation the soil pressureexceeds the maximum allowable bearing capacity of helps in strengthening the building against the lateral forces caused due totornado, earthquake, provides strong surface for the CONSTRUCTION of proposed provide safety to the structure from flow of water and seepage.

3 AIM OF SUPERSTRUCTUREThe aim of providing super-structure is to provide support in the constructionof building as per designed plan and various members of super-structure such ascolumns and beams are designed to provide strength for carrying the dead loadand live load expected to come on the various parts of the structure in a safe andwell distributed manner. TYPES OF CONSTRUCTIONC onstruction can be of following supply etc. AIM OF SITE INSPECTIONAims of site inspectoin of site for of soil near proposed wall and thickness of layers of soil in soil behaviour and in depth of water of flow of water and its in earth layer due to any reason if to CONSTRUCTION Work :: 27 SITE CLEARANCEB efore starting any CONSTRUCTION work it becomes necessary to clear the placefrom the unwanted grass, jungles, trees and plants etc.

4 In case of any hill likeappearance on the ground, that too needs to be cleared of the excess earth and ifthere is a pit, it is required to be filled up. This total job is called site after the site clearance lay out of the structure at site can be planned. Atthe time of clearing of the site it should be remembered that any plant whosegirth is more than 30 cm above the ground is designated as tree, and no tree canbe removed without taking permission from the appropriate this way clearance of site of the unwanted jungles, shrubs, trees etc.

5 Andkeeping of felled trees at a distance away upto 10 m or more forms the part ofthe agreement of the contractor for which payment are required to be made andall these things are written in the agreement paper, which is required for explainingthe terms and conditions. LAYING OUT THE BUILDING PLAN AT SITE FOR FOUNDATIONThe total load of all the wall etc. including that of the beams and columns finalcome on the ground which is called foundation soil. Engineers at site and designoffice decide the size of foundation for their foundation depth, length andbreadth etc.

6 And type of Work the layout plan you will observe the size of CONSTRUCTION in the plot andalso the distances which should be left out of CONSTRUCTION from theboundaries. This is called set back distance from the boundary wall. This isclearly shown in the layout is required to draw line on the ground of the proposed CONSTRUCTION . It isdone by putting lime powder along a string stretched along the proposedline of CONSTRUCTION . These lines extend at least one meter away from theactual end lines and they are called reference lines.

7 They remain even afterthe earth digging or cutting is over for foundation :: Certificate in CONSTRUCTION Supervision (CIVIL)Fig. bench Mark pillar is also constructed at site which gives the level of plinthand foundation etc. permanently. Water level marks are used for this bench mark is required to be secured till the end of the map will be kept in proper orientation with respect to the site. Generallythe longest wall of the building is considered as base line. Refer Plate , Plate No. 4, Plate No. to CONSTRUCTION Work :: 29 Fig. :: Certificate in CONSTRUCTION Supervision (CIVIL)Fig.

8 To CONSTRUCTION Work :: after leaving the set back distance from the first wall limit from theboundary, the line parallel to wall will be plated on the ground dependingupon the set back distance. In this fashion all the four sides of the buildingwill be laid on the plotting the first corner other remaining corners are also plotted onthe plotting the 90o angle on the ground either cross staff is used orPythagoras Theorem is used (3, 4 & 5). this all the centre line will be extended up to to m as per thedirection of the Engineer and guide pillars are required to be : Use of Masonry pillarsThe height of the masonry pillars will be equal to the height of the plinth .

9 Thelevel of the floor is called plinth the lengths and distances are measured with the help of standard chain ortape (steel) WHAT HAVE YOU LEARNT Requirement of foundation is extremely important and its use andconstruction should be according to :: Certificate in CONSTRUCTION Supervision (CIVIL) Similarly the use of super-structure above is also very important. Methods of laying out the foundation plan of building are many. Guide pillars are very important for laying the building plan at the site. TERMINAL is the use of any structure in the foundation?

10 Do you understand by the plinth level? General Tape or string is not used for measurement? do you understand by guide pillars?