LEED Certication Guidebook - | dgs
Sep 24, 2008 · • LEED for New Construction and Major Renovations v2.2 • LEED for Commercial Interiors v2.0 • LEED for Core and Shell v2.0 • LEED for Existing Buildings: Operations and Maintenance • LEED for Schools • LEED for Homes Current LEED Rating Systems will be updated in 2009. All projects registered for LEED with the USGBC before
Tags:
Project, Commercial, Construction, For commercial
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Resources for the Creative Curriculum® Reduce Reuse ...
dgs.dc.govThe Creative Curriculum® includes suggested books as part of the curriculum. Here are some other books suggestions that may be age-appropriate and relevant:
FR-900B Employer/Payor Withholding This is a FILL-IN ...
dgs.dc.govForms FR-900M or FR-900Q $. Account Number DCW007B Tax Period Ending (MMYY) Preparer’s PTIN $. $. $. OFFICIAL USE ONLY Vendor ID#0002 This is a FILL-IN format. Please do not handwrite any data on this form other than your signature. Due Date Fill in if amended return
DAVIS BACON WAGE RATES - | dgs
dgs.dc.govchain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper, structural demolition. MARB0002-004 07/01/2013 Rates Fringes MARBLE/STONE MASON $ 33.58 15.13 INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing ...
Attachment F Davis-Bacon Wage Rate - Washington, D.C.
dgs.dc.govoperator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any
Page 1 of 10 - Washington, D.C.
dgs.dc.govUnlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ----- The body of each wage determination lists the classification
Related documents
A Guide for Consumers - California
www.bpelsg.ca.gov· the functions and responsibilities of an engineer ... construction techniques, and performance evaluation of civil engineering works influenced by ... Electrical engineers. may design electrical systems in commercial buildings, educational facilities, and other projects. Electrical engineering generally includes the design of power
The Construction and Design of Concrete Slabs on Grade
pdhonline.comaccomplish this goal, the construction of floor slabs requires close communication between the owner, architect, engineer, contractor and material supplier. The expectations and responsibilities of each participant should be established at a pre-design, pre-bid, and pre-construction meeting. At the pre-design meeting, the
Union Pacific Railroad Public Projects Manual
www.up.com10.3 Checklist for Construction Project or Development Adjacent to UP ROW 10-46 10.4 Checklist for Projects with Traffic Control Plans 10-46 10.5 Checklist for Projects with Overpasses 10-47 10.6 Checklist for Projects with Underpasses 10-47 10.7 Checklist for Projects with At-Grade Crossings 10-47
Preventing Water Damage During Construction
s0.hfdstatic.comTECHNICAL INFORMATION PAPER SERIES: PREVENTING WATER DAMAGE DURING CONSTRUCTION. TAKE THESE PROACTIVE STEPS TO AVOID WATER DAMAGE TO YOUR CONSTRUCTION PROJECTS. continued. While fire is the major cause of damage to buildings under construction, water damage . claims were the second most frequent property loss in …
Guide to Standards - Building and Construction
infostore.saiglobal.comWork Health & Safety Regulations 2011 (s309, Part 6.4) for construction projects over $250,000. The Plan has been developed by Safety Culture Pty Ltd in accordance with the Work Health & Safety Act 2011 and Work Health & Safety Regulations 2011. To help you maintain compliance and safely manage your construction sites, the Work Health and
Project, Standards, Construction, Building, Construction project, To standards building and construction
A Guide to Building Commissioning
www.pnnl.govto the design intent and owner’s project requirements. The commissioning process for new construction integrates the traditionally separate functions of design, construction, and operation by bringing the project team together dur-ing each phase of the project. Existing building commissioning investigates,
API 650 – ABOVEGROUND STORAGE TANKS, Part I: Code ...
etcfunsafe.comelements of the tank. In view of the materials of construction, requirements and recommendations are set forth, i.e.: erection sequences, welding procedures, tests and inspections as well as guidelines for operation. 1.1.2) API 620 The standard API 620 covers the design and construction of large tanks
Design, Construction, Part, Storage, Tanks, Aboveground, 650 aboveground storage tanks
FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN ...
www.wbdg.orgSuperseding: UFC 1-300-09N, Design Procedures, 25 May 2005, with Changes 1-9 Description: This FC provides specific guidance on how and when to provide a project design deliverable for NAVFAC. This document is organized into design deliverables and design phases. Requirements for design deliverables, beyond or in more detail of