Example: quiz answers

Model EVMU /EVMUG / EVMUL - EBARA Fluid …

Operating Instructions, Installation & Maintenance Manual Model evmu / evmug / EVMULE bara Fluid HandlingEbara International CorporationStainless Steel Vertical MultistageCertified to NSF/ANSI 61, ANNEX GEbara Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev. 11/10 Manufacturer InformationSectionPageManufacturer Information21 General Information and Warnings22 Specifications33 Pump Checks & Installation64 Operation85 Motor Installation on Bare Pump106 removing Motor from Complete Pump117 General Pump Maintenance and Disassembly Instructions 12 Torque Specifications21 Sectional View22 EBARA Fluid Handling1651 Cedar Line Driverock Hill, SC 29730 Phone: (803) 327-5005 Fax: (803) 327-5097e-mail: site: * NSF/ANSI 61 Annex G listed models: EVMU3-18, EVMUL all models 3-64 Section 1 General Information and Wa

Always check to make sure pump was not damaged in shipment before accepting delivery. If damage is evident, a claim should be filed with the carrier at that time.

Tags:

  Model, Check, Model evmu evmug evmul, Evmu, Evmug, Evmul

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Model EVMU /EVMUG / EVMUL - EBARA Fluid …

1 Operating Instructions, Installation & Maintenance Manual Model evmu / evmug / EVMULE bara Fluid HandlingEbara International CorporationStainless Steel Vertical MultistageCertified to NSF/ANSI 61, ANNEX GEbara Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev. 11/10 Manufacturer InformationSectionPageManufacturer Information21 General Information and Warnings22 Specifications33 Pump Checks & Installation64 Operation85 Motor Installation on Bare Pump106 removing Motor from Complete Pump117 General Pump Maintenance and Disassembly Instructions 12 Torque Specifications21 Sectional View22 EBARA Fluid Handling1651 Cedar Line Driverock Hill, SC 29730 Phone: (803) 327-5005 Fax: (803) 327-5097e-mail: site: * NSF/ANSI 61 Annex G listed models.

2 EVMU3-18, EVMUL all models 3-64 Section 1 General Information and WarningsBefore any work is performed on the evmu pump, care should be taken to ensure that electric power is disconnected to the motor to prevent electric shock or prematurestarting which could cause damage to persons, things or the starting the evmu pump, make sure that all cables, electrical connections and controls are in perfect working order and properly grounded. Improper installationcan result in serious or even mortal accidents to persons. Any electrical work should be preformed by a licensed user must comply with all local and national regulations that apply to the installation and operation of electric pumps.

3 Operation of the evmu pump must be compatible with the construction of the pump as shown in the SPECIFICaTION section of these instructions.!! pumps with motor installed tend to be top heavy, care should be taken in handling and transporting to prevent damage or injury caused by the pump falling Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev. 01/08Be careful not to exceed the given specifications in the use of your 2 SpecificationsCaUTION!!Models evmu 3, 5, 10, 18 EVMUL 3, 5, 10, 18 EVMUEVMULS izeaNSI raised faceSuction11/4'' for evmu 3 and 52'' for evmu 10 and 18aNSI raised faceDischarge11/4'' for evmu 3 and 5 2'' for evmu 10 and 184'' for EVMUG64 Range of HP1/2to 1/2to 25 HPRange of Performanceat 3450 rPMCapacity 4 to 118 GPM Head 27 to 830 feetLiquid handledType of liquidClean water (for other clean liquids, consult factory)Temperature5 to +248 F (-15 to 120 C)Working pressure370 PSI (25 bar) max.

4 MaterialsEVMUEVMULEVMUGI mpelleraISI 304aISI 316 Intermediate casingaISI 304aISI 316bottom casingaISI 304aISI 316 Casing coveraISI 304aISI 316 Outer casingaISI 304aISI 316 ShaftaISI 316aISI 316 Liner ringPTFE/aISI 316 Motor bracketCast iron/304 Cast iron/316baseCast iron/304 Cast iron/316 Pump bearingSealed ball bearing/tungsten carbideShaft SealMechanical seal Silicon/Carbide/Carbon/FPMM otorTypeNEMa C/TC/TSC frameSpeed60 Hz, 3450 rPM (2 poles)Three Phase208-230/460 VDirection of RotationClockwise when viewed from motor endTest standardISO 9906 annex aConsult factory for optional motor typesEbara Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev.

5 11/10 Section 2 Specifications ( )Models evmug 32, 45, 64 EVMUL 32, 45, 64 EVMUGEVMULS izeaNSI raised faceSuction21/2'' for EVMUG323'' for EVMUG454'' for EVMUG64 DischargeaNSI raised face21/2'' for EVMUG323'' for EVMUG454'' for EVMUG64 Range of HP5 to 50 HPRange of Performanceat 3450 rPMCapacity 66 to 390 GPMHead 44 to 930 feetLiquid handledType of liquidClean water (for other clean liquids, consult factory)Temperature5 to +248 F (-15 to 120 C)sWorking pressureto 440 PSI (30 bar) max. (see page 813 for specifics)MaterialsImpelleraISI 304aISI 316 Intermediate casingaISI 304aISI 316bottom casingCast ironaISI 316 Casing coverCast ironaISI 316 Outer casingaISI 304aISI 316 ShaftaISI 316aISI 316 Liner ringPTFE/aISI 316 Motor bracketCast ironCast iron/316baseCast ironCast iron/316 Pump bearingThrust bearing: Sealed ball bearingradial bearing in wet end.

6 Tungsten CarbideShaft SealMechanical seal Silicon/Carbide/Carbon/FPM(see page 815 for construction details)MotorTypeNEMa TC/TSC frameSpeed60 Hz, 3450 rPM (2 poles)Three Phase208-230/460 VDirection of RotationClockwise when viewed from motor endTest standardISO 9906 annex aConsult factory for optional motor typesEbara Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev. 11/10 Models evmu 3, 5, 10, 18 EVMUL 3, 5, 10, 18 Models evmug 32, 45, 64 EVMUL 32, 45, 64 Model DesignationM o d e l Ty p e : EBARA Ver tical Multistage (USA) D=Open Drip Proof (ODP) T=Totally Enclosed Fan Cooled (TEFC) evmu L 3- 2 F 0050 D 1 S Silicon Carbide/Carbon Mechanical Seal 1=Single Phase 3=Three Phase (none) -304 SS Construction L - 316 SS Construction Total number of impellersFlanged Connections Horsepower 0050=1/2 HP 0500= HP 0075=3/4 HP 0750= HP 0100= HP 1000=10 HP 0150= HP 1500=15 HP 0200= HP 2000=20 HP 0300= HP 2500=25 HP Nominal Size EBARA Ver tical Multistage (USA)

7 T=Totally Enclosed Fan CooledD=Open Drip Proof evmu G 3- 0750 T 3 S Silicon Carbide/Carbon Mechanical Seal 1=Single Phase 3=Three Phase G - 304 SS with Cast iron bottom casing L - 316 SS ConstructionTotal number of impellers Horsepower 0500=5HP2500=25HP0750= Nominal size 2 Number of reduced diameter impellers F Flanged Connections check to make sure pump was not damaged in shipment before accepting delivery. If damage is evident, a claim should be filed with the carrier at that check the pump label against the requirement to make sure you are installing the properpump specified for the sure that the pump suction, marked by a sticker, is connected to the liquid source and that the discharge, similarly marked.

8 Is connected to the discharge sure that the pump base is firmly secured to a solid flat surface and that the suction and discharge lines are aligned and properly supported to prevent pipe strain on the that the suction and discharge gaskets are properly installed to prevent leaks and that they do not restrict the flow to or from the pump. Standard ANSI mating flanges should be used to connect the pump to the piping. Suction and discharge piping should be no smaller than the respective pump port valves should be installed on both the suction and discharge side of the pump in the event service of the pump is adequate space and ventilation around the pump for service and motor the installation of the motor is necessary, refer to section 5 for Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev.

9 11/10On three phase motor installations, always check for proper motor rotation prior to starting byjogging the motor. Shaft rotation must turn clockwise when viewed from the top of the motor. Make sure the motor is correctly wired, refer to instructions on motor name 3 Pump Checks and InstallationCaUTION!!Use standard plumbing practices to ensure unnecessary line losses, cavitation and prevent air !! EBARA Stainless Steel Vertical MultistageEVMUI nstructions and OperationEbaraFluid (t) 803 327-5005 (f) 803 327-5097rev. 11 Priming the PumpCompletely prime the pump by removing the vent plug (212).

10 Using a funnel, fill the pump body with water until it overflows and replace plug. Alternatively for installations with positive suction heads, close the discharge valve and remove the vent plug. Open the suction valve until liquid flows out of the vent plug opening and then replace the vent plug securely and open discharge is recommended that a bleed valve be installed in discharge line or in a line from the vent port to the reservoir. This will allow the pressure in the pump to be relieved for service. , valves and fittings must have a pressure rating equal to or greater than the maximum system bypass or pressure relief valve should be installed in the discharge line if there is any possibilitythe pump may operate against a closed valve in the discharge line.


Related search queries