SPECIFIC REGISTRATION REQUIREMENTS FOR …
SPECIFIC REGISTRATION REQUIREMENTS FOR CONSTRUCTION-RELATED WORKHEAD (CR) Workhead Title Description CR01 Minor Construction Works Minor building and civil engineering works that are not governed by the Building Control Act such as drainage, minor road works, aprons and minor A & A.
Tags:
Requirements, Construction, Registration, Specific, Related, Workhead, Specific registration requirements for, Specific registration requirements for construction related workhead
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Sample of Inspection and Test Plan (ITP)
bca.gov.sgSample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. Appendix A 2.2 BR / ADOS Prior to Start Work Visual / Specifications Each Delivery Section 3 As per Specification Storage and Handling of Material • Engineered Wood • Skirting • Underlay • Moisture Barrier • Wood ...
Sample of Inspection and Test Plan (ITP)
bca.gov.sgSample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. Appendix A Submission (Shop Drawing / Method Statement) Shop Drawings 1.2 BR / ADOS Prior to Start Work Approved Submission Review Each unit type - As per Specification Method Statement 1.3 BR / ADOS Prior to Start Work ...
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL …
bca.gov.sgThe roof trusses would then sit on the wall panels to carry the roof system and roof loads. The sizes and spacing of the structural members would depend on the design loads. Generally, BHP Steel Lysaght recommends the following: • Lysaght C75 and Lysaght C100 sections would be used as the wall studs.
STRATA MANAGEMENT GUIDE : 4
bca.gov.sg1.1 As mentioned in Strata Management Guide 3, the general meeting is a platform for the subsidiary proprietors (SPs) of a management corporation (MC) to decide on matters relating to the management, operation and administration of their estate. 1.2 To ensure that the proceedings of a general meeting are proper, the MC may wish
Singapore - Building and Construction Authority
bca.gov.sga city to reduce its carbon footprint in the long term, whether in terms of energy and water efficiency, waste reduction or the use of sustainable materials. In 2005, BCA kick-started its drive to green Singapore’s physical landscape by launching the BCA Green Mark: a rating system to evaluate a building’s environmental impact and
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF
bca.gov.sg12.2 DESIGN AND CONSTRUCTION OF FLAT ROOF ... First a small groove line can be cut on the parapet wall, then the L-shaped metal strip can be nailed on to the wall. Finally, the PVC membrane can be ... in order to prevent water seepage at the weak pipe/slab joint. Fig. 12.12 – PVC coated strips for perimeter terminations.
6. INSTALLATION
bca.gov.sgapproved method statement, material and sample. 2. Placing of infill and insulation material • All infill and insulation material for installation as per approved method statement and material. • Ensure all spaces are filled with insulation material. • Ensure that all recessed panels, electrical outlets, light switch boxes, etc
SINGAPORE CIVIL DEFENCE FORCE
bca.gov.sgthe above existing buildings when major retrofitting works are carried out in the building. With reference to SCDF‟s circular to the building industry on “Extent of responsibility of QPs for A&A works” dated 5 Feb 2010, „major retrofitting works‟ are those works where the QP is required to check the „affected unit and the
Chapter 10 CONSTRUCTION METHOD FOR LIGHT GAUGE …
bca.gov.sgWire brick ties which simply clip on to steel studs are available for brick veneer construction. For single wall construction fibre cement sheeting can be fixed to steel frames with self-drilling, self-embedding head screws. Timber weatherboards can be
Methods, Chapter, Construction, Light, Gauge, Brick, Ties, Brick tie, Chapter 10 construction method for light gauge
Related documents
Ford Motor Company Customer-Specific Requirements
www.iatfglobaloversight.orgSee Ford Specific Requirements to ISO/TS 16949 for details . 4 Reporting, Identification and Marking of Materials (PPAP section 2.2.1.1) • Ford materials reporting requirement and compliance details are specified in Ford's Restricted Substance
General Food Labelling Requirements
www.adafsa.gov.ae3.9 Exemptions from Mandatory Labeling Requirements 36 4. Additional Mandatory Labeling For Specific Categories Foods 37 4.1 Gluten free foods 37 4.2 Food for use in weight control – food diets 38 4.3 Pre-packaged foods for special dietary uses 38 Table of Contents Contents Pages