7. The solar PV capacity shall not exceed the service connection capacity / sanctioned load. If a consumer proposes to install a solar PV system with the capacity that exceeds the service connection sanctioned load, a service connection enhancement application shall be submitted by the consumer in addition to the solar net metering application.