TYPICAL PUMP INSTALLATION DETAILS

4 1 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING SHEETTYPICAL PUMPINSTALLATION DETAILS4 2 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING PUMPBASE-MOUNTED END INSTALLATION DETAILGATE (OR GLOBE)VALVESTRAINERPRESSUREGAUGE COCKGATE (OR GLOBE)VALVECHECK VALVEFLEXIBLECONNECTIONFLANGEDINCREASERH OLD DOWNBOLT3/4" (DN20) DRAINVALVEMIN. 5 PIPES SUPPORTFINISHED FLOOR LEVELCONCRETE FOUNDATIONBASE PLATVIBRATIONISOLATORAS REQUIREDDISCHARGESUCTIONNOTES:2- 2 1/2" (DN65) AND LARGER SUCTION & DISCHARGE PIPE JOINTSSHALL BE WELDED AND FLANGED ACCORDING TO THE 2"(DN50) AND SMALLER PIPES SHALL HAVE THREADED 2 1/2" & LARGERFLANGED REDUCERFOR 2 1/2"&

notes: 1- the pump shall be installed dead level and shall not touch or rest on any part of the building structure. 2- the electrical connection to the pump shall be

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of TYPICAL PUMP INSTALLATION DETAILS

1 4 1 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING SHEETTYPICAL PUMPINSTALLATION DETAILS4 2 IPS-D-AR-019NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDATEDATEIRANIAN PETROLEUM STANDARDSDRAWING PUMPBASE-MOUNTED END INSTALLATION DETAILGATE (OR GLOBE)VALVESTRAINERPRESSUREGAUGE COCKGATE (OR GLOBE)VALVECHECK VALVEFLEXIBLECONNECTIONFLANGEDINCREASERH OLD DOWNBOLT3/4" (DN20) DRAINVALVEMIN. 5 PIPES SUPPORTFINISHED FLOOR LEVELCONCRETE FOUNDATIONBASE PLATVIBRATIONISOLATORAS REQUIREDDISCHARGESUCTIONNOTES:2- 2 1/2" (DN65) AND LARGER SUCTION & DISCHARGE PIPE JOINTSSHALL BE WELDED AND FLANGED ACCORDING TO THE 2"(DN50) AND SMALLER PIPES SHALL HAVE THREADED 2 1/2" & LARGERFLANGED REDUCERFOR 2 1/2"& LARGERTHE TYPE OF ELBOW SHALL BE LONG RADIUSNOTES.

2 1- THE PUMP SHALL BE INSTALLED DEAD LEVEL AND SHALL NOT TOUCH OR REST ON ANY PART OF THE BUILDING THE ELECTRICAL CONNECTION TO THE PUMP SHALL BE3-THE PUMP SHALL BE SO INSTALLED THAT THE PUMP CAN BE COMPLETELY REMOVED WITHOUT THE DISMANTLINGOR REMOVAL OF ANY PIPING OR THE MOTOR & COUPLING SHALL BE CHECKED ANDAND PROPERLY ALIGNED IN STRICT ACCORDANCE WITHWITH THE MANUFACTURER S THE ADJACENT PIPING SHALL BE CAREFULL ANDY FITTEDAND ERECTED SO THAT THE PUMP CAN BE INSTALLEDOR REMOVED FROM THE PIPE LINE WITHOUT FORCING OR AFTER THE SYSTEM HAS BEEN COMPLETED AND THETHE PUMP STARTED, THE PUMP AND SYSTEM SHALLBE CHECKED FOR VIBRATION AND EXCESSIVE NOISEAND ANY SUCH NOISE OR VIBRATION SHALL BEIMMEDIATELY )

3 FOR LUBRICATION7- AFTER COMPLETION OF THE SYSTEM AND BEFORESTART-UP OF THE PUMP, THE PUMP, SHALL BELUBRICATED IN STRICT ACCORDANCE WITH THEMANUFACTURER S A METAL INSTRUCTION PLATE SHALL BE ATTACHED TO THEPUMP IN A LOCATION WHERE IT IS CLEARLY INSTRUCTIONS SHALL INDICATE THE RECOMMENDEDLUBRICANT, THE POINTS OF LUBRICATION AND THERECOMMENDED FREQUENCY OF )FOR INSTALLATIONEND ELEVATIONSIDE ELEVATIONPIPE FROM SYSTEM SEE PLANSFOR CONTINUATIONGATE VALVE50mm. (2") DIAL COMPOUND GAGE0-760mm.(0-30") HG VACUUM0-4 Kg/cm (0-60 PSI) PRESSURE21/4"(DN8) SHUT-OFF COCKUNION TYPE CONNECTION PIPE,SO PUMP CAN BE REMOVEDFOR CIRCULATING PUMP50mm.

4 (2") DIAL0-4Kg/cm. (0-60 PSI)DISCHARGE " (DN8) SHUT-OFF TO BE LEFT SHUT-OFFEXCEPT WHEN ACTUALLYCHECKING SYSTEM VALVEPIPE TO SYSTEM SEE PLANS FOR CONTINUATIONNIPPLEREDUCING TEELUBRICATIONPOINTSMOTORREDUCING TEENIPPLENIPPLE,, AT LEAST 450mm. LONG. 3 REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONIRANIAN PETROLEUM STANDARDSDRAWING CIRCULATING PUMPINSTALLATION DETAILSMADE THROUGH THE USE OF FLEXIBLE COUNDUIT(GREENFIELD)4 4 IPS-D-AR-019 IRANIAN PETROLEUM STANDARDSDRAWING REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATIONDETAILS OF THE INSTALLATIONOF THE DOUBLE SUCTIONHORIZONTALLY SPLIT CASE PUMPBEDPLATEPUMP BEDPLATE + 150mmPUMPBEDPLATESUCTION SIDE GAGEDISCHARGE SIDE GAGE115mm.

5 (4 1/2") DIAL0-760 mm.(0-30") Kg/cm (0-60 )2 COMPOUND GAGE1/4" " (DN8) COCKCONNECT TOSUCTION PIPEAS SHOWN BELOW 115mm. (4 1/2") DIAL0-4 Kg/cm (0-60 )2 GAGECONNECT ASSHOWN FORSUCTION GAGESTUFF WASTEAROUND BOLTWHILE POURINGGROUTLEAVE SURFACEOF FOUNDATIONROUGH TO AFFORDGOOD HOLD FORGROUTEXTEND ABOVEOF BOLT. DO NOT3 TIMES DIAMETERPIPE OR CONDUITROUGH SURFACEOF FOUNDATIONFIG 1-ARRANGEMENT OFFOUNDATION BOLTALLOW BOLTS TO PROJECT FORGROUTING UNDER BEDPLATE MAKE THIS DISTANCE EQUAL TO LUG ON ORCONDUITPLATEFIG 2- TEMPLATE FOR HANGING FOUNDATIONBOLTS WHILE POURING THE ELBOW3" (DN80) PIPE LEGWELDED TO ELBOW TO+ LINESOLID CONC.

6 BASE CONSTRUCT FROMDIMENSIONS GIVEN ON APPROVEDSHOP DRAWINGS FOR DISCHARGESIZEPIPES SIZE SHALL BE ASSHOWN ON PROJECT GATE VALVETILTING DISCCHECK VALVESUCTIONTHE SIZE OF THE PUMP SUCTION SHALL BETHE SIZE SHOWN FORTHE PIPE ON SHALL NOTBE REDUCED IN SIZEREGARDLESS OF FLOWRATES SHOWNCOUPLING GUARDCOUPLING MOTORHOLD DOWNBOLTSVIBRATION ELIMINATOR PAD SHALLBE SCIENTIFICALLY DESIGNED OFRESILIENT MATERIAL, MOLDED OFNEOPRENE, 8mm.(5/16") THICK,CROSSRIBBED CONSTRUCTION, INSTALLED UNDER COMPLETE BASE OF ELEVATION3/4" (DN20) HOSEEND DRAIN VALVEFRONT ELEVATIONPUMP SUCTION SIZESUPPORT WEIGHT OF PIPEPUMP ALIGNMENTCONTRACTOR SHALL CHECK,TEST,& START EACH BASE MOUNTED MANUFACTURER ALIGN THE PUMP WITH A DIAL INDICATOR WITHIN 002 PUMP & SHALL HAVE THE PUMPAMP.

7 DISCHARGE & SUCTION READINGS SHALLBE RECORDED & FORWARDED FOR RECORD PURPOSES.**OUTSIDE STEM & YOKEIRON PIPE SIZE**GROUTMOTOR*