Example: marketing

VECTOR™ 50 DIRECT VENT LINEAR GAS APPLIANCE

24 Napoleon Road, Barrie, Ontario, Canada L4M 0G8 214 Bayview Drive, Barrie, Ontario, Canada L4N 4Y8 Fireplaces, Heating and Cooling: 705-721-1212 Grills: 705 726-4278 50 DIRECT VENT LINEAR GAS APPLIANCEW415-1874 / A / cationsFront OptionsFraming DimensionsModelBTUW idthHeightDepthViewing AreaActualFramingActualFramingActualFram ingLV50N-236,00065 5/16 65 13/16 41 3/167319 7/820 1/852 3/4 X 18 5/8LV50N2-236,00065 5/16 65 13/16 41 3/167316 3/1616 3/1652 3/4 X 18 5/8single-sidedRefLV50-2E20 1/8 ( )F65 13/16 ( )JOptional - APPLIANCE does not need to be elevated above fl oor*L73 ( )EJFminimum framingLnote:The LV series requires a minimum enclosure height of 73 measured from the bottom of the APPLIANCE . For temperature requirements, this area must be left unobstructed. Some venting confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and combustibles.

VECTOR™ 50 DIRECT VENT LINEAR GAS APPLIANCE W415-1874 / A / 02.04.19 Specifi cations Front Options Framing Dimensions Model BTU Width Height Depth Viewing Area Actual Framing Actual Framing Actual Framing ... for sections of horizontal vent-ing) outside of enclosure. 73” ...

Tags:

  Vents, Vent ing

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of VECTOR™ 50 DIRECT VENT LINEAR GAS APPLIANCE

1 24 Napoleon Road, Barrie, Ontario, Canada L4M 0G8 214 Bayview Drive, Barrie, Ontario, Canada L4N 4Y8 Fireplaces, Heating and Cooling: 705-721-1212 Grills: 705 726-4278 50 DIRECT VENT LINEAR GAS APPLIANCEW415-1874 / A / cationsFront OptionsFraming DimensionsModelBTUW idthHeightDepthViewing AreaActualFramingActualFramingActualFram ingLV50N-236,00065 5/16 65 13/16 41 3/167319 7/820 1/852 3/4 X 18 5/8LV50N2-236,00065 5/16 65 13/16 41 3/167316 3/1616 3/1652 3/4 X 18 5/8single-sidedRefLV50-2E20 1/8 ( )F65 13/16 ( )JOptional - APPLIANCE does not need to be elevated above fl oor*L73 ( )EJFminimum framingLnote:The LV series requires a minimum enclosure height of 73 measured from the bottom of the APPLIANCE . For temperature requirements, this area must be left unobstructed. Some venting confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and combustibles.

2 Note:Before framing the APPLIANCE , ensure to install the fi restop fi framing the APPLIANCE , ensure to install the fi restop fi rst as it will not fi t between the studs if installed after framing.* Minimum enclosure height maybe higher depending on venting confi guration (see minimum distance to combustibles). RefLV50-2E16 3/16 ( )F65 13/16 ( )JOptional - APPLIANCE does not need to be elevated above fl oor*L73 ( )EFJminimum framingLnote:The LV series requires a minimum enclosure height of 73 measured from the bottom of the APPLIANCE . For temperature requirements, this area must be left unobstructed. Some venting confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and combustibles. note:Product information provided is not complete and is subject to change without notice.

3 Please consult the installation manual for the most up to date installation "MAX ADJUSTMENTMIN. PROJECTION FROM FINISHING MATERIAL38"53716"4738"1934"121516"SLF50K /SSPSB50SS/K 17916" A 3612" 1418" 114" MAX. ADJUSTMENT1 NOTE 1" 51 7/8 48 1/2 24 Napoleon Road, Barrie, Ontario, Canada L4M 0G8 214 Bayview Drive, Barrie, Ontario, Canada L4N 4Y8 Fireplaces, Heating and Cooling: 705-721-1212 Grills: 705 726-4278 50 DIRECT VENT LINEAR GAS APPLIANCEP roduct information provided is not complete and is subject to change without notice. Please consult the installation manual for the most up to date installation PenetrationAppliance LocationCombustible Mantel ClearancesLV50-2A(Finishing Flange)52 3/4 (1340mm)B 65 5/16 (1659mm)C69 5/16 (1761mm)*Finishing flange depth. (The finishing flange defines the perimeter of the fireplace opening. Framing or finishing materials must NEVER encroach inside the finishing flange.)

4 Single-sidedLV50-2A(Finishing Flange)52 3/4 (1340mm)B 65 5/16 (1659mm)C69 5/16 (1761mm)see-thrusingle-sidedThe LV series requires a minimum enclosure height of 73 ( ) measured from the bottom of the APPLIANCE . For temperature requirements, this area must be left unobstructed. Some venting confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and :Horizontal vent sections: A minimum clearance of 3 (76mm) on the top outside of the enclosure and 2 (51mm) on the sides and bottom outside of the enclosure all around the vent pipe on all horizontal runs to combustibles is required. Horizontal vent sections within enclosures require a minimum clearance of 6 (152mm) at the top of the vent pipe. Vertical vent sections: A minimum of 1 (25mm) all around the vent pipe on all vertical runs to combustibles is required except for clearances in appliances enclo-sures.

5 Vertical vent sections within enclosures require a minimum clearance of 1 (25mm) around the vent pipe. see-thruHorizontal vent sections: A minimum clearance of 3 (76mm) on the top outside of the enclosure and 2 (51mm) on the sides and bottom outside of the enclosure all around the vent pipe on all horizontal runs to combustibles is required. Horizontal vent sections within enclosures require a minimum clearance of 6 (152mm) at the top of the vent pipe. Vertical vent sections: A minimum of 1 (25mm) all around the vent pipe on all vertical runs to combustibles is required except for clearances in appliances enclosures. Vertical vent sections within enclosures require a minimum clearance of 1 (25mm) around the vent pipe. 0.+/-.:3'4:+2 MANTEL DEPTH12 3456789101124681012141618202224 ATop of finishing flangeBottom of the appliance25 11/16" ( )2 Bottom of fi nishing fl angeOptional hearth extension (no depth restriction)MANTEL HEIGHTMANTEL DEPTHLV50-2*E20 1/8 ( )F 65 13/16 ( )G72 1/4 ( )H18 3/16 ( )I102 3/16 ( )minimum framingW415-1874 / A / 3/16"1046mm 7 1/16"179mm 18 5/8"473mm 3 1/8"80mm 19 7/8"1/2 [ ]505mm 32 3/4"832mm 39 11/16"1008mm 8 1/16"205mm 8 1/16"205mm 8"203mm 5"127mm ABCSAFETY BARRIER*Base of air collarsee-thru(41 3/16"1046mm 7 1/16"179mm 18 5/8"473mm 3 1/8"80mm 32 3/4"832mm 39 11/16"1008mm 16 3/16"411mm 8 1/16"205mm 8 1/16"205mm 8"203mm 5"127mm 1/2"[ ]1/2"[ ]ABCSAFETY BARRIER**Base of air collarDo not put objects in front of the APPLIANCE (minimum distance of 4 feet))

6 FGFHI*E1 ( ) ( ) min.*Single-sided model [76mm] top (outside of enclosure)2 [51mm] sides / bottom (outside of enclosure)0 to non-combustible fi nishing such as brick and stone6 [152mm] minimum(inside enclosure)0 to bottom of the appliance0 to side standoffs1/2 fi nishing fl angeWhen passing through a ceiling, use fi restop spacer W500-0028 (not supplied)When passing through a wall, use fi restop spacer W615-0162 (supplied with W010-4178 fi restop spacer assembly)0 to back standoffs1 [25mm] minimum all sides for sections of vertical [76mm] (minimum all sides for sections of horizontal vent-ing) outside of minimumThe LV series requires a minimum enclosure height of 73 ( ) measured from the bottom of the ap-pliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and :Shaded components (fi nish framing) must be non-combustible.

7 SAFETY BARRIER1/2 fi nishing fl ange (4 sides)3 [76mm] top (out-side of enclosure)2 [51mm] sides / bottom (outside of enclosure)0 to non-combustible fi nish-ing such as brick and stone6 [152mm] minimum(inside enclosure) 0 to side standoffs0 to base of the applianceWhen passing through a ceiling, use fi restop spacer W500-0028 (not supplied)When passing through a wall, use fi restop spacer W615-0162 (sup-plied with W010-4178 fi restop spacer assembly)1 [25mm] minimum all sides for sections of vertical [76mm] (minimum all sides for sections of horizontal vent-ing) outside of ( ) components (fi nish framing) must be non-combustible :73 minimum*Finishing flange depth. (The finishing flange defines the perimeter of the fireplace opening. Framing or finishing materials must NEVER encroach inside the finishing flange.)24 Napoleon Road, Barrie, Ontario, Canada L4M 0G8 214 Bayview Drive, Barrie, Ontario, Canada L4N 4Y8 Fireplaces, Heating and Cooling: 705-721-1212 Grills: 705 726-4278 RIE VECTORMD 50 FOYER GAZ D VACUATION DIRECTEW415-1874 / A / cifi cationsFa ades OptionnelleDimensions d ossatureMod leBTUL argeurHauteurLargeurDimensions de VisioneR elOssatureR elOssatureR elOssatureLV50N-236,00065 5/16 65 13/16 41 3/167319 7/820 1/852 3/4 X 18 5/8LV50N2-236,00065 5/16 65 13/16 41 3/167316 3/1616 3/1652 3/4 X 18 5/8 RefLV50-2E20 1/8 ( )F65 13/16 ( )JOptionnel - l appareil ne doit pas tre lev au-dessus du plancher*L73 ( )EJFossature minimumLnote:La s rie LV requis un minimum hau-teur de l enceinte de 73 mesur du bas de l appareil.

8 Pour les exigences de temp ratures, cet espace doit tre d gager. Certains confi gurations requis une enceinte plus large pour fournir les d gagements minimaux entre les conduits d vacuation et les :Avant d encadrer l appareil, assurez-vous d installer l espaceur d encadrer l appareil, assurez-vous d installer l espaceur coupe-feu premier avant qu il ne soit pas adapt entre les goujouns apr s l encadrement.* L hauteur minimum de l enceinte peut tre plus grand d pendant du confi guration d vacuation (voir distance minimum aux mat riaux combustibles). RefLV50-2E16 3/16 ( )F65 13/16 ( )JOptionnel - l appareil ne doit pas tre lev au-dessus du plancher*L73 ( )EFJossature minimumLnote:La s rie LV requis un minimum hau-teur de l enceinte de 73 mesur du bas de l appareil. Pour les exigences de temp ratures, cet espace doit tre d gager. Certains confi gurations requis une enceinte plus large pour fournir les d gagements minimaux entre les conduits d vacuation et les combustibles.

9 Note:Information du produit fourni n est pas complet et est sujet de changer sans pr avis. Consultez le manuel d installation pour info-formation d installation "MAX ADJUSTMENTMIN. PROJECTION FROM FINISHING MATERIAL38"53716"4738"34"121516"SLF50K/S SPSB50SS/K 17916" A 3612" 1418" 114" MAX. ADJUSTMENT1 NOTE 1" 51 7/8 un seul c t voir travers48 1/2 24 Napoleon Road, Barrie, Ontario, Canada L4M 0G8 214 Bayview Drive, Barrie, Ontario, Canada L4N 4Y8 Fireplaces, Heating and Cooling: 705-721-1212 Grills: 705 726-4278 RIE VECTORMD 50 FOYER GAZ D VACUATION DIRECTEI nformation du produit fourni n est pas complet et est sujet de changer sans pr avis. Consultez le manuel d installation pour info-formation d installation d un section dans un murLocation de l appareilD gagements Combustible de la TabletteLV50-2A(Bride de finition)52 3/4 (1340mm)B 65 5/16 (1659mm)C69 5/16 (1761mm)* La profondeur de la bride de finition (la bride de finition d finit le p rim tre de l ouverture de la chemin e.)

10 Les mat riaux de charpente ou de finition NE JAMAIS empi t l int rieur de la bride de (Bride de finition)52 3/4 (1340mm)B 65 5/16 (1659mm)C69 5/16 (1761mm)La s rie LV n cessite une hauteur minimale de 73 (185,4cm) mesur e par le bas de l appareil. Pour les exigences de temp ratures, l espace doit tre laisser sans obstruction. Certains confi gurations qui requis une course verticale plus large aura besoin d une enceinte plus large pour fournir les d gagements minimaux entre les conduits d vacuation et les :Sections d vents horizontales: Un d gagement minimum aux mat riaux combustibles de 3 (76mm) au-dessus hors de l enceinte et 2 (51mm) sur les c t s et au-dessous hors de l enceinte toute autour du conduit d vacuation sur toutes les courses horizontales. Les sections d vacuation horizontales dans les enceintes doit maintenir un d gagement minimaux de 6 (152mm) au-dessus du conduit d vacuation.


Related search queries