ANALYZED UNIT COST SCHEDULE - Iowa

ANALYZED UNIT COST SCHEDULE 4-1 ANALYZED UNIT COST SCHEDULE TABLE OF CONTENTS SECTION 4 Built-In Cabinets ---------------------------------------- ---------------------------------------- -------- 4 - 13 Built-In Vacuums ---------------------------------------- ---------------------------------------- ------- 4 - 14 Chimneys and Stacks ---------------------------------------- ---------------------------------------- - 4 - 37 Cold Storage ---------------------------------------- ---------------------------------------- ------------ 4 - 45 Craneways ---------------------------------------- ---------------------------------------- --------------- 4 - 46 Dock Levelers ---------------------------------------- ---------------------------------------- ----------- 4 - 35 Doors ---------------------------------------- ---------------------------------------- ---------------------- 4 - 9 Electrical ---------------------------------------- ---------------------------------------- ----------------- 4 - 26 Elevators and Moving Stairs ---------------------------------------- -------------------------------- 4 - 33 Excavation ---------------------------------------- ---------------------------------------- --------------- 4 - 2 Exterior Walls.

Normal high-rise construction requires caisson to remain in place. DOLPHINS Price Range Pile Cluster Type (7 to 13 wood piles) $22,000 - $35,000 Sheet Pile Cell (topped with concrete 17’ to 30’ diameter) 60,000 - 120,000 Support Piers (3’ to 10’ diameter) 13,000 - 29,000 ...

Loading..

Tags:

  High

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of ANALYZED UNIT COST SCHEDULE - Iowa

Related search queries