Transcription of (PROJECT STANDARDS AND SPECIFICATIONS)
{{id}} {{{paragraph}}}
Page : 1 of 21. KLM Technology Group Rev: 01. Project Engineering April 2012. Standard KLM Technology Group #03-12 Block Aronia, SPECIFICATIONS FOR PUMP INSPECTION. Jalan Sri Perkasa 2. Taman Tampoi Utama 81200 Johor Bahru (PROJECT STANDARDS AND SPECIFICATIONS). Malaysia TABLE OF CONTENT. SCOPE 2. REFERENCES 2. DEFINITIONS AND TERMINOLOGY 2. GENERAL 2. INTRODUCTION 2. PREDICTIVE MAINTENANCE SCHEDULE FOR CENTRIFUGAL PUMPS 3. PREVENTIVE MAINTENANCE INSPECTION SCHEDULE FOR. CENTRIFUGAL PUMPS 3. Horizontal Centrifugal Pumps (Both ends supported) 3.
ii. Condition of outboard bearing, lock nut and lock washer (in case lock washer found damaged and lock nut loose, shaft axial play shall be checked) iii. Following items of Journal bearings : a) High spot (High Spots shall be scrapped) b) Condition of thrust bearing, lock nut and lock washer (in case lock washer found damaged and lock nut ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}