Offshore wind Power Development in 2017 Japan wind Power Association (JWPA) wind Power Experience in Japan (2016)Hibikinada2013 JSW 2 MWKabashimaat GotoIslands2012 14 FHI 100kW2013-16 Hitachi 2MW Floating ChoshiJan 2013 MHI FHI 2MW X 7units2013 Hitachi 2 MWX 8unitsFukushima FORWARD2013 Hitachi 2MW2016 MHI 7MW2017 Hitachi5MW Floating Setana2003 Vestas600kW X 2unitsSakata, 2004 Vestas2MW X 5unitsSasebo, 20091/10 Model(Floating)Black: Early :Fixed typeBrown:Floating(small)Blue:Floating type: National ProjectNote: FHI s WTG division has merged by Hitachi in July , (2013,failed)500kW Model(Floating)Akita, 2015 Siemens 3 MWHakata, 2011 Lens type 3kW X 2units Floating Fukuejima2016 Hitachi 2MW Floating Relocated toOffshore wind Power Experience in Japan 2016 3 MW, 28 turbines, 9 projects at 8 locations in total at the end of is of total wind Power installa

Offshore Wind Power Development in Japan Feb. 28 2017 Japan Wind Power Association (JWPA) http://jwpa.jp 1

Tags:

  Development, Offshore, Wind, Offshore wind

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Offshore Wind Power Development in Japan - …

1 Offshore wind Power Development in 2017 Japan wind Power Association (JWPA) wind Power Experience in Japan (2016)Hibikinada2013 JSW 2 MWKabashimaat GotoIslands2012 14 FHI 100kW2013-16 Hitachi 2MW Floating ChoshiJan 2013 MHI FHI 2MW X 7units2013 Hitachi 2 MWX 8unitsFukushima FORWARD2013 Hitachi 2MW2016 MHI 7MW2017 Hitachi5MW Floating Setana2003 Vestas600kW X 2unitsSakata, 2004 Vestas2MW X 5unitsSasebo, 20091/10 Model(Floating)Black: Early :Fixed typeBrown:Floating(small)Blue:Floating type: National ProjectNote: FHI s WTG division has merged by Hitachi in July , (2013,failed)500kW Model(Floating)Akita, 2015 Siemens 3 MWHakata, 2011 Lens type 3kW X 2units Floating Fukuejima2016 Hitachi 2MW Floating Relocated toOffshore wind Power Experience in Japan 2016 3 MW, 28 turbines, 9 projects at 8 locations in total at the end of is of total wind Power installation (3,234MW) in Japan .

2 MW, 23 turbines (74%) are commercial or local government owned all of them are very closed to seashore, so-called Semi- Offshore . Dolphin type or Monopiletype foundations are used at these projects. Real Offshore projects (more than 1km from seashore) are National type by NEDO : MM, 2 turbines at Choshiand at Kitakyusyu(Gravity type) (Jacket type foundation) Floating type by MOE : 2 MW, 1 turbine at Kabashima(Spar type floater)(GOTO-FOWT) ItgrantedtoGotocity,relocated 10km southeast to Fukue-island, reconnected to grid, and started commercial operation in Apr. 2016.

3 Floating type by METI : 9 MW, 2 turbines at Fukushima (Semi-sub type floater)(FukushimaFORWARD, on going) 5 MWturbine on advanced spar type floaterwas anchored in 2016 and it starts official operation in Mar. wind Power Experience in Japan (2016) 4 Offshore projects by Local governments and private companies Photo by Tokyo ShinbunDec. 2003At Setanaport in HokkaidoBy Local government (Setana)700m Offshore , 3m in depthVestas600kWx 2 turbinesDolphin type foundation1stoffshore wind Power in JapanFeb. 2010 at Kamisuin IbaragiBy WindPowerGroupOffshore from 40 50m 4m in depthFHI Hitachi 2 MWx 7turbinesMonopilefoundation ( 3m) : MWT92 Offshore modelFoundation: Gravity typeOutput: Dia.

4 : 92mHub Ht.: 80mWater Depth: 12m3km from seashoreRef: NEDO (New Energy and IndustrialTechnology Development Organization) 285m ChibaIbaragiDemonstration of Offshore wind Power Generationby NEDO, at Choshi, Chiba ,400mSwitchingGear Under sea cableWTGA nemometer Tower 7 Demonstration of Offshore wind Power Generationby NEDO, at Hibikinada, Fukuoka : NEDOH ybrid Gravity FoundationIn Operation on June :NEDOJSW J82 2MW gearless PMSG WTGH ybrid Spar type Floater is made by pre-stressed length : mUndersea length : 7 m1/10 Model, spar type floaterCo-research by Sasebo Heavy Industry and Kyoto University in at Sasebo bay in Nagasaki pref.

5 Lenz type wind turbines by Kyushu University3kW X 2 units, on the hexashape floater by polystyrene foamin operation at Hakata bay in Fukuoka : Offshore wind and marine stream hybrid Power system, 500kW, by MODEC 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights wind turbine and Savoniuswater wheel (ballastweight) are connected by gear coupling-Supported by Japanese NEDO-MODEC intended to 500kW prototype demonstration at Genkai-nada in Saga pref. in 2013. -Two troubles happened and MODEC quitted wheel has dropped during damaged at anchoring, and sunk by depth: 96m(LSWL)-99m(HSWL)Distance from land: 1kmDistance for marine cable: 2kmVaverage@60m: @60m: : : 14secMax Current: Floating WTG Projectat Kabashimain GotoIslands, Nagasaki Pref.

6 (GOTO-FOWT)Hitachi sDown wind type2MW wind turbine28 : in Operation2MW floating turbine was relocated in 2016 MOE snational project has finished in Mar. turbine was granted from MOE to Co. has moved WTGabout 10km southwestfrom Kabashimato more population(38k) and larger electricity capacity than was re-connected to the gridline and started commercial operation in Apr. approved Offshore wind tariff 36 JPY/kWh for it. (1st and only case in Japan )Relocated(10km)Ref: Press release by Toda Co. on 15 Apr. 2016 : Taken by Mr. HoichiNishiyama5km from seashoreToda Co. announced to develop 21MW floatingoffshore windfarm at Gotoislands on 3 ; Fukushima Offshore wind consortium2013201320162017 Hitachi 2 MWMitsui semi-subMHI 7 MWMHI semi-subHitachi5 MWJMU SparHitachiJMU SparFukushima floating WT project (Overview)Project Consortium:11 members Marubeni (Project integrator)MHIU niversity of TokyoMitsubishi Marine UnitedMES Nippon SteelHitachiFurukawa ElectricShimizu Corp.

7 Mizuho Information & ResearchMETI s Fukushima Recovery, Experimental Offshore Floating wind Farm Project(FukushimaFORWARD)Latest Picture for FukushimaFORWARDF loating substation (Hitachi)on advanced spartype floater (JMU), since 20131st 2MW turbine (Hitachi downwind type) on semi-sub type floater(Mitsui Zosen),since 20132nd7MW turbine (Mitsubishi hydraulic type) on semi-sub type floater(Mitsubishi),since 20163rdfloating turbine-5MW turbine (Hitachi, downwind type) is ready for spar type floater is under construction at dockyard in turbine was installed on the floater at Osaka bay and carried to Fukushima in been completed at Osaka on 24 May 2016.

8 April,2016, at Sakai Dockyardof HITZOn 2 May at Osaka baySumotoportOn 9 May On 14 May On 18 May On 19 May On 24 May The floater has leaned , it was recovered within 5 sDown wind type5MW turbineHTW126 Coming Offshore wind Power Projects in Japan (2016)-1897 MW, 18projects at 13 locations in of them are under EIA procedure . -1387 MW, 13 projects are commercial earliest one shall be Kashima port1 1st . -5MW floating turbine is added at Fukushima in 2017-3-4 MW floating turbine shall be added at Kitakyushu in 2018 by NEDO new project-Japanese Government (MOE) settled two Offshore Test fieldsLegal Hurdles;-Port associated area :Cleared in 2016-General common area :Start discussion in 2016 Coming Offshore wind Power Projects in Japan (2016) Roadmap for the wind Power Introduction for Japan , proposed by the JWPA 10 GWprospect at Energy mix plan shall be achieved at early 2020s.

9 ( at 2016 + during EIA process = 14GW) JWPA proposes toward 2030 for the next year-end: 3,038,000kWEIAA dded: 10,100,000kW19 Japan has Huge wind Energy Resources20 JWPA Onshore speed >considering social acceptanceOffshore speed 7m>Distance 30km<Sea depth 200<considering social acceptanceHurdles against Offshore wind in Japan Small official target by Japanese government (820MW). Restrictedshallowsea area (surrounded by deep sea) Floating wind Power for deepsea by national projects were very expensive. Poor grid infrastructureat good wind area (Hokkaido & Tohoku, northern Japan ) Moderate wind speed (Low income) at Offshore area in central & western Japan Big law uncertainty at General common sea area (So-calledThomasHobbes s the war of all against all.)

10 Who has the permission rights ? is not clear Fishermen s rights, Decommissioning, etc.) Lack of Jack up ships/SEP , Base ports Cabotage/ Labor restriction for Jack up ships LongEIAprocess(4-5 years)Japanese trade company Marubeni retired from Kashima port Offshore project due to low profitability(Local developer Komatsuzakigroup continues project)10 Port and Harbor Law has been amended to promote Offshore wind Power Development in Japan on 13 News for GWEC, reported by JWPAYou can see themat JWPA s Web MILT amended Port and harbor law to promote Offshore wind Power at Port associated area in May 2016 The contents of amendment make it clear.