Example: quiz answers

Operating Instructions - acu-rite.com

DRO 203 DRO 300 Operating InstructionsDigital ReadoutEnglish (en)03/2018 Contents 2 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 213 Transport and of 437 Basic 659 Milling specific 9510 Turning specific 13112 Measured value the IOB and 17916 What to do and 187 Contents ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 these on the on reading the and distribution of the group for the in this and fonts used for marking safety of the Operating safety in the on the safety 263 Transport and supplied and case of damage in and 30 Contents 4 ACU-RITE | DRO 203.

DRO 203 DRO 300 Operating Instructions Digital Readout English (en) 03/2018

Tags:

  Operating, Instructions, Operating instructions

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Operating Instructions - acu-rite.com

1 DRO 203 DRO 300 Operating InstructionsDigital ReadoutEnglish (en)03/2018 Contents 2 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 213 Transport and of 437 Basic 659 Milling specific 9510 Turning specific 13112 Measured value the IOB and 17916 What to do and 187 Contents ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 these on the on reading the and distribution of the group for the in this and fonts used for marking safety of the Operating safety in the on the safety 263 Transport and supplied and case of damage in and 30 Contents 4 ACU-RITE | DRO 203.

2 DRO 300 | Operating Instructions | 03 on Single-Pos on Multi-Pos in a mounting a the an a USB the line of position, nominal position, and workpiece workpiece angle reference head reference 49 Contents ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03/201857 Basic panel and positioning input mark a specific reference Job 62 Contents 6 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 Color Value positioning Bar Compensation for Mill View ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03/201879 Milling specific soft and tool a a a workpiece datum without using the probing with a with an edge a target distance distance and linear 118 Contents 8 ACU-RITE | DRO 203.

3 DRO 300 | Operating Instructions | 03/201810 Turning specific display and tool a a a datum a datum using the Lock Axis and radius a new features in a a Tool a Datum a Preset a Position a Circle Pattern a Linear Pattern a the graphical a 137 Contents ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03/2018912 Measured value output using an edge the IOB Speed Speed control Speed control surface speed control the IOB to the inverter of a 10 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 default Value Pos Bar Compensation (milling applications only).

4 View Color 17715 Service and to the factory ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03/20181116 What to do 18417 Removal and dimensions and mating 1891 FundamentalsFundamentals | About these Instructions 1 14 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 these instructionsThese Instructions provide all the information and safety precautions needed forthe safe operation of the on the productProduct designationPart numberDRO 2033 axes1197250-xxDRO 3033 axes with IOB 610/KT 130 connection1197251-xxDRO 3044 axes with IOB 610/KT 130 connection1197251-xxThe ID label is provided on the back of the.

5 IDSN1234567-xxDRO xxx12 345 678 designation2 Part number3 IndexValidity of the documentationBefore using the documentation and the product, you need to verify that thedocumentation matches the the part number and the index indicated in the documentation withthe corresponding data given on the ID label of the productIf the part numbers and indexes match, the documentation is validIf the part numbers and indexes do not match so that thedocumentation is not valid, you will find the current documentation forthe product at | Notes on reading the documentation 1 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 on reading the documentationThe table below lists the components of the documentation in the order of priorityfor accidents, personal injury or property damage caused by non-compliance with the documentation!

6 Failure to comply with the documentation may result in fatal accidents, personalinjury or property the documentation carefully from beginning to endKeep the documentation for future referenceDocumentationDescriptionAddendu mAn addendum supplements or supersedesthe corresponding contents of the OperatingInstructions and, if applicable, of the Installa-tion Instructions . If this document is included inthe shipment, read it first before you other contents of the documentation retaintheir InstructionsThe Installation Instructions contain all the infor-mation and safety precautions needed for theproper mounting and installation of the are an excerpt from the Operating Instruc-tions and are included in every shipment. Thisdocument has the second highest priority InstructionsThe Operating Instructions contain all the infor-mation and safety precautions needed for theproper operation of the product according toits intended use.

7 This document has the thirdhighest priority for reading. This documentationcan be downloaded from the download areaat The Operating Instruc-tions must be printed prior to commissioningthe of connectedmeasuring devices and otherperipheralsThese documents are not included in are shipped with the respective measuringdevices and you like any changes, or have you found any errors?We are continuously striving to improve our documentation for you. Please help usby sending your requests to the following e-mail | Storage and distribution of the documentation 1 16 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 and distribution of the documentationThe Instructions must be kept in the immediate vicinity of the workplace and mustbe available to all personnel at all times.

8 The Operating company must inform thepersonnel where these Instructions are kept. If the Instructions have becomeillegible, the Operating company must obtain a replacement from the the product is given or resold to any other party, the following documents mustbe passed on to the new owner:Addendum, if suppliedInstallation InstructionsOperating group for the instructionsThese Instructions must be read and observed by every person who performs anyof the following tasks:MountingInstallationCommissioningS etup, programming and operationService, cleaning and maintenanceTroubleshootingRemoval and disposalFundamentals | Notes in this documentation 1 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 in this documentationSafety precautionsComply with all safety precautions indicated in these Instructions and in yourmachine tool builder's documentation!

9 Precautionary statements warn of hazards in handling the product and provideinformation on their prevention. Precautionary statements are classified by hazardseverity and divided into the following groups:DANGERD anger indicates hazards for persons. If you do not follow the avoidanceinstructions, the hazard will result in death or severe indicates hazards for persons. If you do not follow the avoidanceinstructions, the hazard could result in death or serious indicates hazards for persons. If you do not follow the avoidanceinstructions, the hazard could result in minor or moderate indicates danger to material or data. If you do not follow the avoidanceinstructions, the hazard could result in things other than personal injury, likeproperty | Notes in this documentation 1 18 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03/2018 Informational notesObserve the informational notes provided in these Instructions to ensure reliableand efficient operation of the these Instructions , you will find the following informational notes.

10 The information symbol indicates a tip provides important additional or supplementary gear symbol indicates that the function described depends on themachine, machine must feature a certain software or hardware optionThe behavior of the function depends on the configurable machinesettingsThe book symbol represents a cross reference to externaldocumentation, the documentation of your machine tool builder orother | Symbols and fonts used for marking text 1 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 and fonts used for marking textIn these Instructions the following symbols and fonts are used for marking an action and the result of this actionExample:Press the enter keyThe parameters are saved and the Job Setup menu an item of a listExample:Installation SetupJob SetupBoldIdentifies menus, screens, displays, keys, and soft keysExample:Press the Setup soft keyThe Configuration Menu is | Overview 2 22 ACU-RITE | DRO 203, DRO 300 | Operating Instructions | 03 chapter provides important safety information needed for the propermounting, installation and operation of the safety precautionsGeneral accepted safety precautions, in particular the applicable precautionsrelating to the handling of live electrical equipment, must be followed whenoperating the system.


Related search queries