PAD-MOUNTED TRANSFORMERSSECTION 26 12 19 26 12 19-1 6/06 SECTION 26 12 19 PAD-MOUNTED TRANSFORMERSGENERALPART Contractor shall furnish and install the PAD-MOUNTED transformer(s) as specified herein as shown on the contract PAD-MOUNTED transformer(s) and all components shall be designed, manufactured and in accordance with the latest applicable NEMA (NEMA 210), IEEE and ANSI standards (ANSI C57).SUBMITTALS FOR following information shall be submitted to the view elevation or outline drawing and entry/exit (on nameplate) and secondary Impulse data applicable, the following additional information shall be submitted to the FOR following information shall be subm

PAD-MOUNTED TRANSFORMERS SECTION 26 12 19 26 12 19-3 6/06 * Note to Spec. Writer – Insert data in blanks * Note to Spec. Writer – Select one c.The equipment manufacturer shall document the requirements necessary for proper

Tags:

  Mounted, Transformers, Pad mounted transformers

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of PAD-MOUNTED TRANSFORMERS SECTION 26 12 …

1 PAD-MOUNTED TRANSFORMERSSECTION 26 12 19 26 12 19-1 6/06 SECTION 26 12 19 PAD-MOUNTED TRANSFORMERSGENERALPART Contractor shall furnish and install the PAD-MOUNTED transformer(s) as specified herein as shown on the contract PAD-MOUNTED transformer(s) and all components shall be designed, manufactured and in accordance with the latest applicable NEMA (NEMA 210), IEEE and ANSI standards (ANSI C57).SUBMITTALS FOR following information shall be submitted to the view elevation or outline drawing and entry/exit (on nameplate)

2 And secondary Impulse data applicable, the following additional information shall be submitted to the FOR following information shall be submitted for record as-built drawings and information for items listed in Paragraph , and incorporate all changes made during the manufacturing processWiring test certification as TRANSFORMERSSECTION 26 12 19 26 12 19-2 6/06* Note to Spec. Writer - Optional* Note to Spec.

3 Writer Select manufacturer of the assembly shall be the manufacturer of the major components within the equipment specified herein, the manufacturer shall be ISO 9001 or 9002 manufacturer of this equipment shall have produced similar electrical equipment for a period of five (5) years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement.*Provide Seismic tested equipment as equipment and major components shall be suitable for and certified to meet applicable seismic requirements of the International Building Code (IBC) for zone 4 application.

4 Guidelines for the installation consistent with these requirements shall be provided by the switchgear manufacturer and be based upon testing of representative equipment. The test response spectrum shall be based upon a 5% minimum damping factor, IBC: a peak of s ( Hz), and a ZPA of s applied at the base of the equipment. The tests shall fully envelop this response spectrum for all equipment natural frequencies up to at least 35 *OR The equipment and major components shall be suitable for and certified to meet applicable seismic requirements of the California Building Code (CBC) through zone 4 application.

5 Guidelines for the installation consistent with these requirements shall be provided by the switchgear manufacturer and be based upon testing of representative equipment. The test response spectrum shall be based upon a 5% minimum damping factor, CBC: a peak of s, and a ZPA of s applied at the base of the equipment. The tests shall fully envelop this response spectrum for all equipment natural frequencies up to at least 35 *OR --The manufacturer may certify the equipment based on a detailed computer of the entire assembly structure and its components.

6 Guidelines for the installation consistent with these requirements shall be provided by the switchgear manufacturer and be based upon testing of representative equipment. The equipment manufacturer shall document the requirements necessary for proper seismic mounting of the equipmentThe following minimum mounting and installation guidelines shall be met, unless modified by the above referenced Contractor shall provide equipment anchorage details, coordinated with the mounting provision, prepared and stamped by a licensed civil engineer in the state. Mounting recommendations shall be provided by the manufacturer based upon approved shake table tests used to verify the seismic design of the equipment manufacturer shall certify that the equipment can withstand, that is, following the seismic event, including both vertical and lateral required response spectra as specified in above TRANSFORMERSSECTION 26 12 19 26 12 19-3 6/06* Note to Spec.

7 Writer Insert data in blanks* Note to Spec. Writer Select oneThe equipment manufacturer shall document the requirements necessary for proper mounting of the equipment. Seismic qualification shall be considered achieved when the capability of the equipment, meets or exceeds the specified response , STORAGE AND shall be handled and stored in accordance with manufacturer s instructions. One A.(1) copy of these instructions shall be included with the equipment at time of AND MAINTENANCE operation and maintenance manuals shall be provided with each assembly and shall include instruction leaflets, instruction bulletins and renewal parts lists where applicable, for the complete assembly and each major primary and secondary voltages and make appropriate tap / Cutler-Hammer productsA.

8 *_____B.* listing of specific manufacturers above does not imply acceptance of their products that do not meet the specified ratings, features and functions. Manufacturers listed above are not relieved from meeting these specifications in their entirety. Products in compliance with the specification and manufactured by others not named will be considered only if pre-approved by the Engineer ten (10) days prior to bid ratings of the transformer shall be as follows or as shown on the Rating*_____OAImpedance *_____%*[+/- 7-1/2%] [ANSI Standard Tolerance] [Minimum] [Maximum]HV *_____kV *[Delta] [Wye]HV BIL *_____kVHV de-energized Taps *_____+/- 2 - 2-1/2% full capacityLV *_____Volts *[Wye] [ Delta]LV BIL *_____kVPAD- mounted TRANSFORMERSSECTION 26 12 19 26 12 19-4 6/06* Note to Spec.

9 Writer Select unit shall be *[mineral oil-] [biodegradable electrical insulating fluid from high oleic oil sources] [silicone/high fire point liquid-] [high-molecular-weight hydro-carbon/high fire point liquid-] filled and shall be in accordance with the latest edition of the NEC. High fire point fluids shall be Factory Mutual and UL transformer shall carry its continuous rating with average winding or temperature rise by that shall not exceed 65 degrees C rise, based on an average ambient of 30 degrees C over 24 hours with a maximum of 40 degrees *OR --The transformer shall carry its continuous rating with average winding temperature rise by that shall not exceed 55 degrees C, based on average ambient of 30 degrees C over 24 hours with a maximum of 40 degrees C.

10 The insulation system shall allow an additional 12% kVA output at 65 degrees C average winding temperature rise by resistance, on a continuous basis, without any decrease in normal transformer transformer shall be designed to meet the sound level standards for liquid TRANSFORMERS defined in NEMA and and low-voltage windings shall be *[aluminum] [copper]. Insulation between of the windings shall be by thermally set insulating paper or main transformer tank and attached components shall be designed to withstand greater than the required operating design value without permanent deformation.