Example: stock market

SECTION 11 ABUTMENT, PIERS, AND RETAINING WALLS

For pre-tensioned or post-tensioned concrete bridges, use methods to increase foundation flexibility when the girder contraction due to elastic shortening, creep, shrinkage and temperature fall exceeds 1 in. Methods include temporarily sliding elements between the …

Tags:

  Section, Post, Walls, Concrete, Tensioned, Retaining, Pire, Abutment, Tensioned concrete, Section 11 abutment, And retaining walls

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of SECTION 11 ABUTMENT, PIERS, AND RETAINING WALLS

Related search queries