ncma TEKN ational concrete Masonry Associationan information series from the national authority on concrete masonry technologyTEK 3-1 CConstruction (2002)ALL-WEATHER CONCRETEMASONRY CONSTRUCTIONINTRODUCTIONM asonry construction can continue during hot, cold, andwet weather conditions. The ability to continue masonry con-struction in adverse weather conditions requires considerationof how environmental conditions may affect the quality of thefinished masonry. In some cases, environmental conditionsmay warrant the use of special construction procedures to ensurethat the masonry work is not adversely of the prerequisites of successful all-weather construc-tion is advance knowledge of local conditions.

NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology TEK 3-1C Construction (2002)

Tags:

  Concrete, Ncma tek, Ncma

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of NCMA TEK

1 ncma TEKN ational concrete Masonry Associationan information series from the national authority on concrete masonry technologyTEK 3-1 CConstruction (2002)ALL-WEATHER CONCRETEMASONRY CONSTRUCTIONINTRODUCTIONM asonry construction can continue during hot, cold, andwet weather conditions. The ability to continue masonry con-struction in adverse weather conditions requires considerationof how environmental conditions may affect the quality of thefinished masonry. In some cases, environmental conditionsmay warrant the use of special construction procedures to ensurethat the masonry work is not adversely of the prerequisites of successful all-weather construc-tion is advance knowledge of local conditions.

2 Work stoppagemay be justified if a short period of very cold or very hot weatheris anticipated. The best source for this type of information is Weather Bureau, Environmental Science Services Admin-istration (ESSA) of the Department of Commerce whichcan be accessed at their web site the following discussion, ambient temperature refers tothe surrounding jobsite temperature when the preparationactivities and construction are in progress. Similarly the meandaily temperature is the average of the hourly temperaturesforecast by the local weather bureau over a 24 hour periodfollowing the onset of construction.

3 Minimum daily tempera-ture is the lowest temperature expected during the between 40 and 90oF ( and ) areconsidered normal temperatures for masonry constructionand therefore do not require special procedures or WEATHER CONSTRUCTIONWhen ambient temperatures fall below 40oF ( ), theSpecification for Masonry Structures (ref. 3) requires consider-ation of special construction procedures to help ensure the finalconstruction is not adversely affected. Similarly when theminimum daily temperature for grouted masonry or the meantemperature for ungrouted masonry falls below 40oF ( )during the first 48 or 24 hours after construction respectively,special protection considerations are.

4 Cold weather construction, construction tech-niques, grout, hot weather construction, mortar, rain, snow,storage of materials, wet weather construction, windyweather constructionMortar and Grout PerformanceHydration and strength development in mortar and groutgenerally occurs at temperatures above 40oF ( ) and onlywhen sufficient water is available. However, masonry construc-tion may proceed when temperatures are below 40oF ( )provided cold weather construction and protection require-ments of reference 3 are and grouts mixed at low temperatures have longersetting and hardening times, and lower early strength than thosemixed at normal temperatures.

5 However, mortars and groutsproduced with heated materials exhibit performance character-istics identical to those produced during warm of FreezingThe initial water content of mortar can be a significantcontributing factor to the resulting properties and perfor-mance of mortar, affecting workability, bond, compressivestrength, and susceptibility to freezing. Research has showna resulting disruptive expansion effect on the cement-aggre-gate matrix when fresh mortars with water contents in excessof 8 %mortar are frozen (ref.)

6 2). This disruptive effectincreases as the water content increases. Therefore, mortarshould not be allowed to freeze until the mortar water contentis reduced from the initial 11% to 16% range to a value below6%. Dry concrete masonry units have a demonstrated capac-ity to achieve this moisture reduction in a relatively shorttime. It is for this reason that the specification requiresprotection from freezing of mortar for only the first 24 hours(ref. 3).Grout is a close relative of mortar in composition andperformance characteristics.

7 During cold weather, however,more attention must be directed toward the protection of groutbecause of the higher water content and resulting disruptiveexpansion that can occur from freezing of that water. Therefore,grouted masonry needs to be protected for longer periods toallow the water content to be cold weather masonry construction, Type III, high-early strength portland cement should be considered in lieu ofType I portland cement in mortar or grout to accelerate acceleration not only reduces the curing time but generatesmore heat which is beneficial in cold 3-1C 2002 National concrete Masonry Association (replaces TEK 3-1B)

8 From precipitation and ground water by storage on pallets or otheracceptable for materials include tarpaulins, reinforced paper,polyethylene, or other water repellent sheet materials. If the weatherand size of the project warrant, a shelter may be provided for thematerial storage and mortar mixing HeatingWhen the ambient temperature falls below 40 F ( C)during construction, or mean daily temperature is predicted to fallbelow 40 F ( C) during the first 24 hours following constructionof ungrouted masonry, or the minimum daily temperature ispredicted to fall below 40 F ( C) during the first 48 hours forgrouted masonry, Specification for Masonry Structures (ref.)

9 3)requires specific construction and protection procedures to beimplemented as summarized in Tables 1a and 1b. As indicated inAdmixturesThe purpose of an accelerating type of admixture is tohasten the hydration of the portland cement in mortar or , admixtures containing chlorides in excess of ions are not permitted to be used in mortar (ref. 3) due tocorrosion of embedded metals and contribution to specifically not addressed by the Specification, the use ofchloride admixtures in grout is generally accelerators are available but they must be used inaddition to cold weather procedures and not as a replacement forthem.

10 Antifreezes are not recommended for use in mortars and areprohibited for use in StorageConstruction materials should be protected from water bycovering. Bagged materials and masonry units should be protectedTable 1a Cold Weather Masonry Construction Requirements (ref. 3) Ambient temperatureConstruction requirementsDo not lay masonry units having a temperature below 20oF ( ). Remove visible snow and iceon masonry units before the unit is laid in the masonry. Remove snow and ice from existing foundation and masonry surfaces to receive new masonry above freezing.