STANDARD OPERATING PROCEDURES - Durban
1.5 Failure to comply with any of the provisions of these Standard Operating Procedures by Officials may result in disciplinary action. 2 Supply Chain Management Objective
Tags:
Operating, Standards, Procedures, Officials, Standard operating procedure
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
THE NATIONAL TREASURY Republic of South …
www.durban.gov.zaTHE NATIONAL TREASURY: Republic of South Africa Supply Chain Management: A Guide for Accounting Officers of Municipalities
Management, Supply, Republic, National, South, Treasury, The national treasury republic of south, The national treasury, Republic of south
Guide to complete application forms - Durban
www.durban.gov.za1.0 Key words Application, form, guide, electrical, assist, connection, applicant. 2.0 Introduction This guide is designed to assist all applicants in completing Customer Services related forms.
Form, Guide, Applications, Complete, Guide to complete application forms
Performance Management Systems Frame Work - …
www.durban.gov.za1 1 Performance Management System Framework Organisational Performance June 2008 (adopted by council on the 27th June 2008)
ENERGY OFFICE - durban.gov.za
www.durban.gov.za3 the Energy Office. All facilitators/trainers have a complete tertiary education and basic understanding of energy efficiency and renewable energy but may not be familiar with all
Contract number: PQ: 7N-12883 Request for …
www.durban.gov.za2 1. Project Title Request for proposals: Economic Development and Job Creation Economic Plan. 2. Background Information The Economic Development and Investment Promotion Unit has drafted the Economic
Economic, Development, Proposal, Request, Request for proposal, Economic development and
Different methods of Surveying Final - Durban
www.durban.gov.zaPage 5 of 11 Engineering Surveys This type of survey is associated with the engineering design (topographic, layout and as built) often
Methods, Engineering, Survey, Final, Different, Surveying, Different methods of surveying final, 11 engineering surveys
EPWP Policy Framework June 07 - Durban
www.durban.gov.zaexpanded public works programme (epwp) november 2006 page 1 ethekwini municipality expanded public works programme (epwp) policy framework prepared by:
Policy, Public, Framework, June, Programme, Work, Expanded, Expanded public works programme, Epwp, Epwp policy framework june 07
eThekwini Municipality CREDIT CONTROL AND …
www.durban.gov.zaCredit Control and Debt Collection Policy 2017-2018 Page 3 of 58 1. PURPOSE This Policy, read together with the eThekwini Municipality Credit Control and …
2017, Control, Direct, 2018, Municipality, Ethekwini municipality credit control and, Ethekwini
PUBLIC SECTOR INTEGRITY MANAGEMENT …
www.durban.gov.za2 PUBLIC SECTOR INTEGRITY MANAGEMENT FRAMEWORK 1 PREAMBLE Whereas the Constitution of the Republic of South Africa, 1996 (the “Constitution”) enshrines the rights of all people in the Republic of South Africa and affirms the democratic values of
Management, Public, Framework, Sector, Integrity, Public sector integrity management, Public sector integrity management framework
Kindly send written comments to: Ms C Kerr or Mrs …
www.durban.gov.zaDRAFT DRAFT DRAFT Message from the Mayor We are proud to present and recommend eThekwini’s Annual Report - 1 July 2003 to 30 June 2004 for your attention.