Example: stock market
BUILD IT WITH PROJECT PLAN OUTFEED TABLE

BUILD IT WITH PROJECT PLAN OUTFEED TABLE

Back to document page

Laminate two sheets of 3/4" plywood to make the top. Coat the entire surface with glue. Clamp the edges and drive a few screws in the underside of the middle area. (Remove the screws after the glue has cured.) Finally, use a dado stack in your table saw to cut the 3/4" wide x 3/8" deep dadoes for the T-track. Locate these grooves 25⁄ 8"

  Surfaces, Table, Outfeed table, Outfeed

Download BUILD IT WITH PROJECT PLAN OUTFEED TABLE


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries